Optimizer4D Technical Specifications
6 / 27
I/O-Port allocation
Port
#
PLC feature
Comment
Input 1
-
Power Switch ON1
Works as Power-on-switch when combined with ON2
Input 1
1.1
Start Measuring at position 1
Input 1
1.2
Start Measuring at position 2
Input 1
1.3
Start Measuring at position 3
Input 1
1.4
Start Measuring at position 4
Input 1
1.5
Start Measuring at position 5 /
Measuring Ins. Strobe
Input 1
1.6
Next work piece
Input 1
1.7
Crack acknowledge
Input 1
1.8
Plug test
Input 1
GND
Input 2
Power Switch ON2
Works as Power-on-switch when combined with ON1
Input 2
2.1
Select work piece Strobe
Input 2
2.2
Select work piece 0
Input 2
2.3
Select work piece 1
Input 2
2.4
Select work piece 2
Input 2
2.5
Select work piece 3
Input 2
2.6
Select work piece 4
Input 2
2.7
Input 2
2.8
Input 2
GND
Output 3
24 V
24 V Input / V
CC
Output 3
3.1
Ready for measuring
Output 3
3.2
Busy
Output 3
3.3
Measuring running
Output 3
3.4
Crack
Output 3
3.5
Break
Output 3
3.6
Output 3
3.7
Output 3
3.8
Output 3
GND
In/Output 4
24 V
In/Output 4
4.1
In/Output 4
4.2
In/Output 4
4.3
In/Output 4
4.4
In/Output 4
4.5
In/Output 4
4.6
In/Output 4
4.7
In/Output 4
4.8
In/Output 4
GND