English
22
10.4 Assembling LAN Connector
Sealing Nut
Rubber Seal
Push the LAN or DRM cable through the side of the ruber seal.
Cable OD range: 4 to 6 mm
Tighten the sealing nut.
(Tightening torque range: 5 to 15 kgf·cm)
10.5 Closing the Covers
Note:
Before close the covers, complete the energy meter and CT installation. Fore details about installing
energy meter and CT, see "11 Energy Meter Wiring & Setting" on page 24.
1
Close the inner cover and tighten the 9 bolts.
■
Bolt: M4
■
Torque: 1.765 Nm / 18 kgf·cm / 15.6 lbf·in