1) Open your mobile browser.
2) Input the URL : https://myess.hansoltechnics.com
3) After connection is made, click the “Go to Installer” icon.
4) Enter your ID and password in the login window.
    If you have no account, please join as a member.
5) Click the “Join Membership” link. Membership acquisition and completion.
6) After login, the main installer page appears select Product 

 Installation.

7) Enter the product information and customer information.
    (When you select a country at Product Info, it is automatically set to
    the country-specific default setting.)

8) If it is saved successfully, you can see the success message.
    It may take 5 to 10 minutes.
9) In order to check operation status, perform the product test. For this purpose,
    select Remote 

 Remote Monitoring. (show in Figure 3-2)

10) When the installed product is in “Run,” click the product serial number.
11) On the product information page, click the “Detailed Product Information” button.
12) On the “Product Details” page, click the “Product Operation Test” button.

CAUTION

- PIN Code is a temporary password that has a-4-digit number

   created by the installer.

- This pin code must be delivered for user registration.

3. Installer Account : Use On-line / Internet connection

1) Set on your laptop (shown in Figure 4-2).
    ControlPanel 

→ 

Network and Sharing Center 

Change adapter settings 

 Local Area Connector 

 Properties

    →

 Internet Protocol Version 4 (TCP/Ipv4)

- Input the URL : https://myess.hansoltechnics.com

2) Connect the jumper to the connector. (* Install Jumper is required, as shown in Figure 4-3.)
3) Connect the LAN cable between Q.HOME+ ESS HYB G2 and Laptop.
4) Turn the power On (AC Grid On) and PV S/W On.
5) Access to SIM (System Install Manager) http://17.91.23.196:8000
6) Turn the power Off (AC Grid Off) and PV S/W Off. 
7) Remove jumper wire for On-line & Internet connection
8) Connect Internet LAN Cable.
9) Turn the power On (AC Grid On) and PV S/W On.

Q.HOME+ ESS HYB G2

- Product Info -
  a) Input Product S/N
  b) Input random PIN Code (Delivered for user registration)
  c) Select Country
      (Automatically set to the country-specific default setting)
  d) Input user’s Telephone number
  e) Input Battery S/N (Enter the number of installed boxes)
  f) If the entered value is correct, click the Next button

Installation

01. Product Info.

Refresh

Next

* If not agreed to the terms, you may not use the services.

[ Figure 3-1 : Product Information Entry Screen in Step 1 ]

[ Figure 4-2 : Setting Laptop IP ]

Short Bar

[ Figure 4-3 : Connecting Short Bar ]

- Serial No.

- PIN Code

- Device Type

- Inverter Power

- Model Name

- Country

- User Telephone

- Battery1

- Battery2

- Battery3

- Battery4

- Battery5

Product

Image

HSHP4601Z100000001

1234

RES

8 kW

HSHP4601

United Kingdom

012-3456-7890

B62842642684D682464

B62842642684D682465

02. Installation Info.

03. Setup Info

04. Rates Info

a
b

c

f

d
e

CLICK!

[ Figure 3-2 : Remote monitoring test ]

*example “HSHP4607Z100000001” test

Remote Monitoring

Remote

Remote Monitoring
Event History

15/06/2018

08:09:51

HSHP4601Z100000001

95%

14

14

0

0

0

Product

Product List
Installation
PV Calculator

User

Account Management
VOC Management

Maintenance

Maintenance History
Activity List

Statistics

Operational Statistics

* SIM (System Install Manager) Connection 

   : Use Off-line & Not an internet connection

5. User Account (Refer to User Guide)

CAUTION

- Turn off Wifi .

- Only turn on Local Area Connection.

IP address : 
Subnet mask : 
Default gateway :

17

255

17

91

255

91

23

224

1

1

0
2

.
.
.

.
.
.

.
.
.

CN906

CN2

CN1

CN3

CN4

CN905

CN901

CN902

Short

Bar

Battery Install

1) Click here.

MENU LIST

BMS Rack Install Setting

BMS Setting

Install Setting

Operating Test

Q.HOME+ ESS HYB G2

Install BMS Setting Menu

Count of Batery RACKs : 

- 1 -

ENTER

4. Installing 

2) Select the number of batteries you want to install.

Battery Installation Process 1

MENU LIST

BMS Rack Install Setting

BMS Setting

Install Setting

Operating Test

Install BMS Setting Menu

Count of Batery RACKs : 

Rack 1

ID = 0X1

Status

Connecting

Configure ID !!!

- 1 -

ENTER

2) Wait for the battery to connect.

1) Click here.

Battery Installation Process 2

MENU LIST

BMS Rack Install Setting

BMS Setting

Install Setting

Operating Test

Install BMS Setting Menu

Count of Batery RACKs : 

Rack 1

ID = 0X2

Status

Done

Configure ID !!!

- 2 -

ENTER

BMS Test

BMS CAN ID

COUNT

1

0X1 3020000

1) If you need to continue installing the battery,
   the Additional Settings button appears as shown picture.

   

2)  Repeat steps “Battery Installation Process 1”.

Rack 2

ID = 0X1

Status

NOP

Configure ID !!!

MENU LIST

BMS Rack Install Setting

BMS Setting

Install Setting

Operating Test

Install BMS Setting Menu

Count of Batery RACKs : 

Rack 1

ID = 0X2

Status

Done

Configure ID !!!

- 2 -

ENTER

BMS Test

BMS CAN ID

COUNT

1

0X1 3020000

1) Conversely, if the Battery installation is completed,
     the following screen will appear.

     

2) Then press the following button to complete
     the Battery installation.

1) Click here.

2) Select a Country & Region.

3) Click here.
    * When you press the button, the screen changes
       as shown below. Then proceed as described in
       the follwing.

Setting Installation Process

Country / Region Information

S/N :

HSHP4601Z100000001

Country : Germany 

Region: Berlin

IP: 14.34.15.211
80

  I  Port

Country / Region Config

SAVE and ReSTART

MENU LIST

- HSHP4601 8.0kWh

- PMS S/W : P02.00.05

Apr 16 2019 - 1_-ESS

BMS Setting

Install Setting

Operating Test

Install Setting Menu

6) Check the number of installed batteries.

9) Select Smart Meter and Type.

8) Enable when the battery in need to emergency.
    Charging mode (Use Jumper as much as possible)

4) For the max power per string.

5) Select a Feed in Limit percentage

Product Information

3300     [W]

* Range : 1000 ~ 3300W

* “0” : the PV 1 is not installed

Installed PV-1 Power :

3300     [W]

* Range : 1000 ~ 3300W

* “0” : the PV 2 is not installed

Installed PV-2 Power :

42         [%]

* Range : 0 ~ 100 (%)

* 100(%) means “No-Limit Feedin”

* 0(%) means “No Feedin”

Feed In Limit percentage

Automatic Operation type

Server’s IP-address and port

Enable

Enable

Sleep-Mode

Disable

PMS External Mode Enable

Disable

Enable

Backup Mode

(Generator Charge Only)

Disable

Smart Mode

(* The “Smart” type is more advanced Algorithm.)

Basic Mode

Battery Count : 

1

Smart Meter Selection

Meter Type : RS485

DO - Meter Model Selection

D0-Bi/Feed-In  4:EM112-DIN.AV0.1.X.S1.X(Gavazzi)

[ Figure 4-1 : Initial setup page block ]

Date / Time Setting

Year/Month/Day

2019     /   4          /   16
8           :   20        :   30

Hour : Minute : Second

SAVE and ReSTART

10) Set the current local time and date

11) After clicking “SAVE and RESTART” on the top of
    the window a message saying “Wait for 2 Minute and
    press F5” will appear 

 follow the message.

12) Click “Operating Test”.

※ 

Please leave the default setting not listed in this manual.

7) Select 3rd Party Connect Enable / Disable.
    (Like as : EnergyBase, KIWIGRID, Solar-log)