background image

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.MAXX-G4

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.MAXX-G4

18

19

4 Electrical connection

4.4 After installation

5 Grounding

Protective Grounding

  The modules must be grounded in accordance with the local 

statutory regulations.

6 Faults and defects

Danger! 
Risk of fatal injury due to electric shock!

  Do not attempt to fix any problems yourself (e.g., glass cracks, 

damaged cables).

  Please contact an installer or Qcells Technical Customer 

Service Department.

7 Disposal

  Do not disconnect modules by yourself.
  Please contact an installer or Qcells Technical Customer 

Service Department.

  Dispose of modules in accordance with the local disposal 

regulations.

  Ensure that all necessary safety and functional tests 

have been carried out according to applicable 
standards.

Note! Module damage may occur!

  Ensure that the plug connections are secured away 

from any water-channelling surface. 

  Integrate the system into the existing lightening 

protection system in accordance with the applicable 
local regulations.

Warning! Fire Risk!

  Do not use light concentrators (e.g. mirrors or lenses).

  Ensure that the cabling is not exposed and / or 

hanging and is protected from dirt, moisture and 
mechanical friction.

Summary of Contents for Q.MAXX-G4 Series

Page 1: ...Installation and operation manual Q MAXX G4 solar module series...

Page 2: ...le stipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any appl...

Page 3: ...TED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION 2 Planning 2...

Page 4: ...structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures su...

Page 5: ...he system installer is responsible for the determination of location specific load requirements Ensure that the connection cables of the junction box do not run between laminate and mounting rails Mod...

Page 6: ...number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum...

Page 7: ...es or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall o...

Page 8: ...may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire op...

Page 9: ...erformed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufact...

Page 10: ...l Do not disconnect modules by yourself Please contact an installer or Qcells Technical Customer Service Department Dispose of modules in accordance with the local disposal regulations Ensure that all...

Page 11: ...Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and taking into a...

Page 12: ...cells Installation manual solar modules Q MAXX G4_2022 06_Rev03_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia EMAIL WEB TEL inquiry aus qcells com...

Reviews: