4 Electrical connection

4.4 After installation

  Ensure that all necessary safety and functional tests 

have been carried out according to applicable 

standards.

Note! Module damage may occur!

  Ensure that the plug connections are secured away 

from any water-channelling surface. 

  Integrate the system into the existing lightening 

protection system in accordance with the applicable 

local regulations.

Warning! Fire Risk!

  Do not use light concentrators (e.g. mirrors or lenses).

  Ensure that the cabling is not exposed and / or 

hanging and is protected from dirt, moisture and 

mechanical friction.

5 Grounding

Protective Grounding

  The modules must be grounded in accordance with the local 

statutory regulations.

6 Faults and defects

Danger! 
Risk of fatal injury due to electric shock!

  Do not attempt to fix any problems yourself (e.g., glass cracks, 

damaged cables).

  Please contact an installer or Qcells Technical Customer 

Service Department.

7 Disposal

  Do not disconnect modules by yourself.

  Please contact an installer or Qcells Technical Customer 

Service Department.

  Dispose of modules in accordance with the local disposal 

regulations.

Summary of Contents for Q.PEAK DUO ML-G11 Series

Page 1: ...Installation and operation manual Q PEAK DUO ML G11 X solar module series...

Page 2: ...e of the solar modules This manual Other applicable stipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations...

Page 3: ...n MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATION OR CONFIGURATION IMPROPER MAINTENANCE...

Page 4: ...ind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Avoid the usage...

Page 5: ...m supplier The listed test load values have been determined with the following clamp parameters clamp width 40mm and clamp depth 10mm The system installer is responsible for the determination of locat...

Page 6: ...y be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is me...

Page 7: ...ght and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 Installation 3 2 Prepar...

Page 8: ...ectric arcs may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that t...

Page 9: ...el see page 3 Ensure correct polarity 4 Electrical connection 4 3 Connection of modules Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and...

Page 10: ...ulations Warning Fire Risk Do not use light concentrators e g mirrors or lenses Ensure that the cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 5 Grou...

Page 11: ...may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and tak...

Page 12: ...n manual solar modules Q PEAK_DUO_ML G11 X_modules_series_2022 06_Rev02_EN HANWHA Q CELLS GMBH OT Thalheim Sonnenallee 17 21 06766 Bitterfeld Wolfen Germany EMAIL WEB TEL FAX sales qcells com www qcel...

Reviews: