Network Switch Installation Guide
Hardware Installation
Unpacking the Hardware
Upon receiving the switch, inspect the packing box. If the packing box was not damaged
in transit, unpack it carefully.
NOTE:
Retain the packing box in case you need to transport the switch.
The packing box is heavy. It is recommended for two persons to carry the box and
perform the installation.
Package Contents
The following items are included with a standard package. When you open the box, check
if all items are included and free of damage.
One QuantaMesh Ethernet switch
Four AC power cords
Console cable
One set of rail kit
Statement paper
It is important to ensure all items are included in the package before starting the
installation.
1
Place the box on a flat and stable surface and cut the straps securing the box.
2
Carefully remove the switch. Then place it on a flat and clean surface.
3
Remove all other items from the box and inspect each item.
Installing the Switch
Site Survey
Consider the following when choosing a location to install the switch:
Installation Location
Ensure that there is adequate space to allow you to access the front and rear panel
ports for easy cable management and maintenance.
Ensure that the site is located within a proper distance to the power source. The power
source must be properly grounded and readily accessible.
Ensure that the site is free from strong electromagnetic field sources, such as
radiators, motors, and heat sources.
Ensure that the site is not exposed to direct sunlight, rain or moisture.
Ventilation
The installation surroundings must have adequate ventilation. Proper clearance
between the switch and the wall or other equipment must be observed.