27
2.1.9
Configura on > Tasks
From the
Configuration
pane, select the
Tasks
menu to:
program a device reboot task,
program an energy management task for the appliance to reduce its energy consump on.
Device restart tasks
To create a restart task, click on the
bu on and then the
+
bu on.
It is therefore possible to program in me several reboot occurrences whose parameters are stored in an ICAL format in the user preference
innes.reboot-manager.calendar
.
Example of value (ICAL format):
BEGIN:VCALENDAR
VERSION:1.0
BEGIN:VEVENT
SUMMARY: Reboot Task 1
DTSTART:20200407T091800
DTEND:20200407T091805
RRULE:FREQ=WEEKLY;BYDAY=MO,TU,WE,TH,FR,SA,SU;UNTIL=20200507T235959
END:VENT
END:VCALENDAR
Device power manager tasks
To create a device power manager task, click on the
bu on and then the
+
bu on.
The possible values programmable in me are
Very highly op mized
,
Highly op mized
,
Op mized means
,
Nominal mode
.
It is possible to create several energy manager tasks in the same day. These se ngs for scheduled power level, start me, end me, occurrence, and excep on are stored in ICAL
format in the user preference
innes.power-manager.calendar
.
Example value (ICAL format):
BEGIN:VCALENDAR
VERSION:1.0
BEGIN:VEVENT
SUMMARY:Standby Task 1
X-POWER-MANAGER-LEVEL:MIN
DTSTART:20190805T090000
DTEND:20190805T120000
RRULE:FREQ=WEEKLY;BYDAY=MO,TU,WE,TH,FR,SA,SU;UNTIL=20200416T0000
END:VENT
END:VCALENDAR
☛
The Power Manager task scheduled at the web interface has no effect when another sleep task is scheduled within the App.
In this version, here is the state of the device when the power manager is in the
Very highly op mized
state:
Summary of Contents for DME204
Page 1: ...User manual 001B DME204 4 13 10...
Page 6: ...6 1 2 1 Device dimensions...