Screen installation
1
、
Remove the shortest two-piece fiberglass tubing from 2
、
Insert the three ends into the other port of the
the inside of the package glass tube in Figure
3
、
Insert one end of the glass tube with the same height as 4. Remove the glass tube and the metal tube with the
the projection screen into one end of the tee connection
。
glass tube connection (two pairs)
5.Insert the glass tube in Figure 4 into one end of the tee 6. Insert the two-way connecting elbow into the
fitting in Figure3 fiberglass tube of Figure 3 and the other end into the
fiberglass tube 4
7, along the glass tube opened the screen, the rope through 8. In the outdoors, please step into the four beach nails
the metal ring will hang the screen on the bracket, if the fixed after installation, as shown.
screen is missing or wrinkled place, you can adjust the length
rope banding
。