17
Transporting
Once the packaging has been removed, cut the
straps and remove the casing in such a way as to
avoid damaging it.
•
If hoisting equipment is available, suitable for
the weight of the boiler, use the eyebolts (1)
provided on the body to lift it
•
If no suitable hoisting equipment is available,
handle the boiler manually, as follows:
•
Remove the fastening screws (2) for the
baseboard (3) and take it off, so as to allow
the pallet to be tilted
•
Insert a suitably sized bar through the two
eyebolts (4) and lift the boiler body.
•
Use safety equipment.
•
Must be Installed on non combustible floor or
cinder blocks extending at least 16" in front and
8" on either side of the 3 WOOD.
•
Construction of cement block pad under 3WOOD
should extend at least 8” to each side of the
boiler and extend at least 2” on either side of the
chimney connector
The room where the 3WOOD Boiler is
installed must be heated and must always
comply with the technical standards and
the local codes.
Allow for the space required to access the
safety / control devices and to perform the
maintenance and loading operations.
•
Do Not
install the
3WOOD
appliances:
•
Outdoors, as they are not designed for
this type of installation.
•
In an unheated room.
•
In rooms with exhaust fans.
•
In houses with heat recovery ventilation
systems. (HRV) with out having a
outside source of ventilation air for the
boiler room.
Recommended
Minimum Clearances
WARNING
CAUTION