20
Installation of Controls
A. Insert the temperature gauge (16) in the housing on the front panel (15) and secure it
B. Partially unwind the capillary tube from the thermometer, insert the sensor in the probe socket (17)
and secure it with the fastening spring
C. Fit the front panel (15), handling the temperature gauge capillary tube to make sure it is not
damaged, and inserting the regulator in the opening provided
D. Secure it to the side panels using the screws supplied.
E. Insert pressure gauge (13) and capillary tube through the panel (15) and install probe into the
tapping on the upper right side of rear section of the boiler (17).
F. Tighten the draft regulator (14) in the housing provided on the boiler body. The cam w/bolt of the
regulator must be in the top position.
17