21
A. Open the loading door (1)
B.
Remove the flue gas cover (2) by
turning the latch
(3)
C. Insert the flue gas partition (4) in the
guide provided and press it fully into
the rear of the boiler.
D. Replace the cover (2) and secure
it with the latch (3)
E. Open the door on the ash collection
chamber (5) and insert the ash tray
(6)
Installation of Draft Regulator
A. The Samson draft regulator is
installed horizontally. The hexagon
screw (8) must be at the top.
Installation of Flue Gas Partition