background image

FIRST YEAR-WARRANTY FOR 3WOOD SERIES 
RESIDENTIAL HOT WATER BOILERS:

 QHT warrants that its 

cast-iron boiler and casing are free from defects in material and 
workmanship for one year from the date of installation. If the boiler 
is found to be defective within this period, QHT will replace the 
boiler block or casing. 
 

LIFETIME WARRANTY-WARRANTY FOR THE CAST IRON 
BOILER BLOCKS OF THE 3WOOD SERIES RESIDENTIAL 
BOILERS: 

Biasi warrants that the cast-iron sections and nipples 

of the BIASI 3WOOD boilers are free from defects in material and 
workmanship for the lifetime of the original single family home 
installation. If the 3WOOD boiler block is then found to be 
defective, QHT and Biasi will replace the original cast iron boiler 
block. 
 
These warranties are subject to the condition that a heating 
contractor whose principal occupation is the sale and installation 
of heating equipment must have installed the boiler. 
PARTS, WHICH ARE COVERED, consists of all materials 
supplied by Biasi, identified by QHT's part numbers in its 
literature. Other parts supplied in the casing, trim kit or in the 
burner pack carry their own warranty and each manufacturer has 
responsibility for its own products. 
 

NOTE: ANY PART, WHICH IS REPLACED UNDER 
WARRANTY, CARRIES ONLY THE UNEXPIRED PORTION OF 
THE ORIGINAL WARRANTY. 

OWNER RESPONSIBILITIES: 
1.  Provide for proper installation, which includes pressure relief 

and pressure reducing valves and high limit safety controls on 
closed systems. 

2.  Provide qualified periodic service to prolong proper operation 

and service. 

3.  Insure that boiler is installed with approved burner and that   

installation conforms to all codes and ordinances. 

4.  This warranty does not apply to boilers, which are subject to 

misuse, abuse, neglect, alteration, accident, excessive 
temperature, excessive pressure, or corrosive water or 
atmosphere. 

5.  Owner will be responsible for return of faulty components to 

QHT Inc. Portsmouth, NH, freight pre-paid. 

QHT and Biasi will not be responsible for: 
1.    Components that are part of the heating system, but 

were not manufactured by Biasi or QHT as part of the boiler. 

2.  The workmanship of the installers of  3WOOD boilers.   

Furthermore, this warranty does not assume any liability for 
unsatisfactory performance caused by improper installation. 

3.  Any costs for labor to remove or replace the faulty 

component. 

4.  Improper burner application or adjustments, control settings, 

care or maintenance. 

5.  Any damage associated with corrosion or leakage due to the 

use of "non-barrier", plastic pipe in the heating system. 

 
*THIS WARRANTY DOES NOT EXTEND TO ANYONE EXCEPT 
THE FIRST PURCHASER AT RETAIL AND ONLY WHEN THE 
BOILER IS IN THE ORIGINAL INSTALLATION SITE. 
*IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR 
PURPOSE AND MERCHANTABILITY SHALL BE LIMITED TO 
THE DURATION OF THE EXPRESSED WARRANTY. BIASI 
AND QHT EXPRESSLY DISCLAIM AND EXCLUDE ANY 
LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES 
FOR BREACH OF ANY EXPRESSED OR IMPLIED WARRANTY. 
 
THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS, AND 
YOU MAY HAVE OTHER RIGHTS THAT VARY FROM STATE 
TO STATE. 
 
For prompt warranty service, notify the installer, who, in turn, will 
notify the distributor from whom he purchased the boiler. If this 
does not result in corrective action, contact Biasi through Quincy 
Hydronic Technologies (Address Below) with details in support of 
the warranty claim. All claims must be processed through proper 
trade channels. Contact with Biasi directly is not recommended for 
rapid claim settlement. 
 

Quincy Hydronic Technologies,   

3560 Lafayette Rd. 

Portsmouth, NH,  03801 

Tel. (603) 334-6400 

Warranty for BIASI - 3WOOD Residential 

Cast-Iron Water Boilers 

NAME                                                                                                                 

STREET                                                                                                               

CITY                                                STATE           ZIP                       

BOILER SERIAL NO.                    DATE OF INSTALL                                                                   

NAME OF INSTALL CO.                                                                

STREET                                                                                                                  

CITY                                                      STATE          ZIP                       

B10 BOILER SIZE (EX. 4 SECTION)                                                                                       

SILVER RATINGS LABEL SERIAL # 

HOW DID YOU HEAR ABOUT BIASI? 

    DEALER/INSTALLER       WEBSITE      FRIEND/NEIGHBOR   

    OTHER

 

PLACE 

STAMP 

HERE 

BIASI BOILER WARRANTY REGISTRATION 

IMPORTANT., Registration required. To gain complete warranty  

protection, fill in and mail this card immediately. 

 
 
 

QHT Inc. 

3560 Lafayette Rd 

Portsmouth, NH 03801 

T

E

A

O

N

 THI

S

 LI

NE

 

Summary of Contents for BIASI 3 WOOD

Page 1: ...tor ____________________ Address _________________________ _________________________ Telephone Number _________________________ OWNER For service and repairs to the heating system please contact your...

Page 2: ...licensed heating contractor We urge you to contact your installing contractor or distributor if you are in question about any aspect of your boilers performance Our main concern is that you are satisf...

Page 3: ...ations 15 Layout of Main Components 16 Transporting and Minimum Clearances 17 Flue Gas Outlet and Combustion Air 18 Assembling the Casing 19 Installation of Controls 20 Installations of Flue Gas Parti...

Page 4: ...ained non electrical zone valves in the zone controlled by the overheat control When references are made to tapping numbers please refer to the specifications sections All firewood used in this boiler...

Page 5: ...or fluids to start the fire DO NOT burn garbage gasoline naphtha propane engine oil or other flammable materials DO NOT fire the 3WOOD during a power failure Use a wood stove during a power failure n...

Page 6: ...ombustion or ventilation air to boiler Should overheating occur do not disconnect electrical supply to circulator Instead open all the flow checks external to the Boilers Do not use this boiler if any...

Page 7: ...olid fuel boiler as the gas or oil fired boiler if any will be completely inoperative 1 Locate any flow check valves in the system See Pg 7 and completely unscrew the knob on the top of all these valv...

Page 8: ...x to the desired level close the loading door securely Damage or injury will result if wood is not loaded carefully generally level with bottom of flue gas damper If loaded in correctly there is a ris...

Page 9: ...mount of heat from a pound of equivalently dry wood no matter what species of tree it comes from But wood is not sold by the pound it is sold by the cord i e by volume Therefore the dense heavy woods...

Page 10: ...0 Hickory Shagbark 20 7 24 8 19 Maple Red 15 0 18 8 24 Maple Sugar 18 4 21 3 16 Oak Red 17 9 21 3 19 Oak White 19 2 22 7 18 Pine Easter White 13 1 13 3 10 Pine Southern yellow 14 2 20 5 44 In Millions...

Page 11: ...ned firewood Mixing small pieces preferably slab wood with every full load Never use only large wood usually less dry during mild weather when combustion is relatively slow The temperature in the stac...

Page 12: ...t leaking creosote Chimney Cleaning Check your chimney and flue pipe at least twice during the heating season check it more frequently if you are new to wood or believe that there is soot or creosote...

Page 13: ...and size of the coal you are using will affect the kindling rate and time required to establish a good deep coal bed There are no set rules but the following suggestions may help 1 Don t run too low a...

Page 14: ...burn time and limit the number of times the door needs to be opened for refueling The front air grille for secondary air in the upper door and the flue gas damper are easily adjusted for tending the...

Page 15: ...d with a cleanout door The heating system should be flushed cleaned of any slime and deposits vented and tested for water tightness The heating system should be equipped with a new expansion tank of s...

Page 16: ...achment 5 Loading Combustion Chamber 17 Flue Gas Damper 6 Flue Gas Baffle 18 Flue Cleanout Door 7 Ash Collection Chamber 19 Casing 8 Ash Pit Door 20 Insulation 9 Ash Tray 21 1 1 2 Flange Supply Outlet...

Page 17: ...ks extending at least 16 in front and 8 on either side of the 3 WOOD Construction of cement block pad under 3WOOD should extend at least 8 to each side of the boiler and extend at least 2 on either si...

Page 18: ...ould be installed with male ends facing down and sealed using materials that can resist temperatures of at least 700 F 1 The solid fuel fired boiler does not draw steadily smells experiences smoke rol...

Page 19: ...tening them C Insert them in the top of the four slots provided at the bottom of the boiler and secure them with the nuts NOTE The four top brackets 2 have holes for fastening the paneling to the tie...

Page 20: ...dling the temperature gauge capillary tube to make sure it is not damaged and inserting the regulator in the opening provided D Secure it to the side panels using the screws supplied E Insert pressure...

Page 21: ...d and press it fully into the rear of the boiler D Replace the cover 2 and secure it with the latch 3 E Open the door on the ash collection chamber 5 and insert the ash tray 6 Installation of Draft Re...

Page 22: ...lator counter clockwise to the red 40 mark which is the minimum position 104 F D Remove chain from bag and cut it 32 long and install the hook and eyelet E Secure the handle 10 by tightening nut 11 Co...

Page 23: ...regulator 3 to the middle position D Adjust the primary air damper 4 so it is open 1 32 at the bottom minimum opening using the screw 5 Lock it in place with the lock nut The regulator arm should be...

Page 24: ...in the line to the radiation as close to the boiler as possible This branch tee should point up and will route the piping to the dump zone There must not be a valve or any potential restriction betwe...

Page 25: ...ory authority PIPING NOTES 1 This drawing is meant to show system piping concept only 2 The installer is responsible for all equipment detailing required by local codes 3 Discharge of Pressure Relief...

Page 26: ...m Mixing valve arrangements can be added to any of the systems described in this section or in fact to any conventional heating system as well We recommend the 4 way mixing valve to control the temper...

Page 27: ...cal codes 2 Discharge of Pressure Relief Valve must be piped without valves to within 3 of the floor 3 Where required Low Water Cutoff must be installed in the Supply piping of the oil gas boiler 4 Th...

Page 28: ...nal codes Use only copper conductors The 3WOOD must be installed without changing the function of the controls or rewiring the original boiler A wiring interconnection is permitted The electrical syst...

Page 29: ...ting radiation supply and return lines from the oil or gas fired boiler Install pipe tees on the supply and returns from nipples coming out of the existing oil gas boiler NOTE Occasionally extra suppl...

Page 30: ...installer is responsible for all equipment detailing required by local codes 2 Discharge of Pressure Relief Valve must be piped without valves to within 3 of the floor 3 Where required Low Water Cutof...

Page 31: ...nal codes Use only copper conductors The 3WOOD must be installed without changing the function of the controls or rewiring the original boiler A wiring interconnection is permitted The electrical syst...

Page 32: ...32...

Page 33: ...59200637 17 Draft Regulator 59200638 18 Flue Gas Baffle Lock 59200639 19 Plate 59200640 20 Partition 59200641 59200641 59200642 59200643 21 Bottom Door 59200644 22 Hinge 59200645 23 Pin 59200646 24 Ga...

Page 34: ...tion Assembly 59200601 59200602 59200603 59200604 3 Rear Panel 59200605 59200605 59200605 59200605 4 Cover Panel 59200606 59200607 59200608 59200609 5 Right Side Panel 59200610 59200611 59200612 59200...

Page 35: ...35...

Page 36: ...rformed by a qualified heating contractor at least once a year so as to clean the entire flue gas path loading combustion chamber smoke box and flues Routine Cleaning Before starting any cleaning oper...

Page 37: ...the open expansion vessel Check operation and replace if necessary The boiler does not reach the set temperature Draft regulator Check operation and replace if necessary Chain unhooked or broken Hook...

Page 38: ..._____________ ______________________ _________________________ ______________________ _________________________ ______________________ Boiler Performance Tests GROSS STACK TEMPERATURE ROOM TEMPERATURE...

Page 39: ...and Biasi will not be responsible for 1 Components that are part of the heating system but were not manufactured by Biasi or QHT as part of the boiler 2 The workmanship of the installers of 3WOOD boi...

Page 40: ...l Web Telephone Fax info qhtinc com www qhtinc com 800 501 7697 603 334 6401 QHT Inc 3560 Lafayette RD Portsmouth NH 03801 For service please contact 3 WOOD Boiler Manufactured by Biasi S p A Verona I...

Reviews: