background image

 

Page 15 

 

The B10  boiler is a high efficiency unit that requires proper venting. The boiler must 

be vented to the outdoors by means of a tile lined masonry or a approved pre-fabricated 
chimney of the size and height recommended by the manufacturer or by a listed "power 
venting" unit which provides draft by mechanical means.  In many installations, particularly 
older interior and most exterior chimneys, a corrosion resistant liner should be installed and 
may be required by code.  Please consult liner manufacturer for the appropriate chimney 
liner. 
         The chimney discharge opening must be located at least 24 inches above any part of 
the building structure within 4 feet of the chimney.  Be sure the chimney and smoke pipe 
won't become obstructed by squirrels, bird nests, soot buildup, chimney liner deterioration, 
etc..  If using a "power venter" system, it is suggested that it should be installed on the 
leeward side of the house.  (Please consult with manufacturer of "power venter" for 
requirements concerning clearances from combustibles and distances from doors and 
windows.)  The "venter" must be installed by a licensed burner  mechanic and done in 
accordance with local codes. This is a very low stack temperature boiler (350F gross temp.) 
so caution should be used when connecting to an outside built chimney.  Should you have 
concern that the flue gases could condense, then you should consider lining the chimney or  
using a listed, "power venting" or " direct venting unit".  If "power venting" is used to 
discharge flue gases, then the power vent  unit should be equipped with a postpurge control 
such as a delay-off, timing control to  prevent problems with fogging and  nozzle post drip.   
 

The exhaust pipe connection from the boiler to the chimney should be as short as 

possible, with a minimum number of elbows. The vent pipe must have a vertical rise of at 
least 1/4 inch per foot of horizontal run. The vent pipe must be of the same diameter as the 
flue outlet on the boiler. The chimney connector should have a minimum thickness of 26 
gauge, corrosion resistant (galvanized) steel, and be assembled with a minimum of three (3) 
sheet-metal screws in each joint. In some one and two story houses, a barometric draft 
control isn't required as the B-10 is designed to be pressure-fired.  However in high draft 
situations which exceed the flue gas resistance through the boiler, a barometric draft control 
is recommended.  The over fire draft should be positive and between 0 and .06 inches of 
water column.  The draft at the breech should be enough to overcome the resistance 
through the boiler.   

7.  Exhaust Venting

 

7.1 Common Exhaust Venting Cont. 

Common vent exhaust: 
 

If this boiler is replacing one that was part of a common venting system, it is 

likely that the vent is to large to vent the appliances still attached to it.  To prevent this, 
at the time of removal, the following steps shall be followed with each appliance re-
maining connected to the common venting system.  Place each appliance in opera-
tion, while the other appliances remaining connected to the common venting system 
are not in operation. 
 

1.Seal any unused openings in the common venting system. 
2.Visually inspect the venting system for proper size and horizontal pitch and deter-

mine there is no blockage or restriction, leakage, corrosion and other deficiencies 
which could cause an unsafe condition. 

Summary of Contents for BIASI B10 Series B3-B9

Page 1: ...qualified installer service agency or the gas supplier Please Read Instructions Carefully Save for Future Reference Manufactured by Biasi S p A Verona Italy Distributed By QHT QUINCY HYDRONIC TECHNOL...

Page 2: ...as those we specify The installing contractor is the best judge of a system s specific requirements as well as the local availability of certain makes and models of controls and accessories The prece...

Page 3: ...16 Gas Venting 7 3 17 Burner Setup 8 18 Oil 8 1 19 Gas 8 2 20 Gas Line Piping 9 21 Boiler Jacket Assembly 10 22 Wiring 11 23 24 Oil Diagrams 11 1 25 28 Gas Diagrams 11 2 29 30 Commissioning the Boiler...

Page 4: ...azards Please read the literature and warranties supplied by the manufacturers of the various accessory equipment This equipment is warranted by the respective manufacturers not by Quincy Hydronic Tec...

Page 5: ...d with those of influenza and the highest incidence of poisoning occurs at the onset of cold weather or during flu season A victim may not experience any symptoms only one symptom or a few symptoms Su...

Page 6: ...your gas supplier call the fire department 7 If you don t smell gas go to the next step 8 Return the manual valve on the combination gas valve to the on position by reversing step 5 9 Turn on all ele...

Page 7: ...or 7248U aquastat 1 Immersion well 1 X 3 Nipple 1 Combo pressure temp gauge 1 30 PSI Pressure relief valve 1 Boiler drain 1 Cera fiber Pad for floor of combustion chamber 2 Plugs 1 X Bushing 1 90 Elb...

Page 8: ...sections together evenly measure with yardstick Draw the sections together until sections make iron to iron contact at a point around the top and bottom ports of each section DO NOT OVER TIGHTEN DRAW...

Page 9: ...erials 1 9 from the top sides and rear of the boiler 2 18 from the flue pipe in any direction 3 24 from the front of the boiler DANGER The boiler must be located on a non combustible floor A smooth le...

Page 10: ...NOTE See Page 19 for available gas burners in North America BIAS Heat Wise BAROMETRIC DAMPER WITH MANUAL RESET SPILL SWITCH ALTERNATIVE DAMPER LOCATION BIASI B10 POWER GAS BURNER GAS COCK DRIP LEG UNI...

Page 11: ...Screw the unit to side panel of the boiler as close to the immersion well as possible using the tabs on the aquastat Run the sensor from behind the aquastat to the immersion well and fix it according...

Page 12: ...the boiler s purging expansion station Clearance for hot water pipes are 1 inch to combustibles The make up water line must be piped into the boiler and be fitted with a backflow preventer and a press...

Page 13: ...ventilation is to come from outside the building Two 2 openings shall be provided with one opening commencing within 12 inches of the top and an opening commencing within 12 inches of the bottom of th...

Page 14: ...a rating of 1 perm or less with openings sealed with gaskets etc 2 Weather stripping has been added on open able windows and doors and caulking or sealants are applied to areas such as joints around w...

Page 15: ...e control such as a delay off timing control to prevent problems with fogging and nozzle post drip The exhaust pipe connection from the boiler to the chimney should be as short as possible with a mini...

Page 16: ...xhaust fans fireplace dampers and any other gas burning appliance to their previous condition of use 7 Any improper operation of the common venting system should be corrected so the installation confo...

Page 17: ...Gas Code ANSI Z223 1 or Section 7 Venting Systems and Air Supply for Appliances of the CAN CGA B149 Installation Codes or applicable provisions of the local building codes Vent connectors serving app...

Page 18: ...check things such as the pump pressure CO2 levels etc Gas 1 Checking the electrode orifice size and flame rod settings against manufacturer s specs to insure proper operation 2 Installing properly siz...

Page 19: ...Head Type L1 L1 V1 V1 V1 2 Setting Air Shutter 8 0 10 0 7 0 10 0 10 0 Air Band 0 0 0 0 0 0 1 0 3 0 The highlighted burners are not listed by ULC and may not be installed on Biasi equipment in Canada T...

Page 20: ...es W C Head Setting Air Gate Man Pres W C Head Setting Air Gate B 4 R200 110 1 06 2 2 1 1 32 2 1 B 5 R200 140 1 20 2 8 2 1 76 2 7 2 B 6 R200 175 1 46 2 8 3 2 34 2 9 3 B 7 R400 207 1 22 2 0 1 48 2 0 B...

Page 21: ...ve When installing the boiler make sure a pipe compound resistant to the action of liquefied petroleum is used Check piping for leaks Always check leaks with a water and soap solution DO NOT USE A FLA...

Page 22: ...l 28 in place and secure with self tapping screws provided Fasten the washers and hex nuts to the ends of the tie rods to hold the jacket in place Set the top panel 27 in place and secure with two scr...

Page 23: ...the boiler when installed must be electrically bonded to ground in accordance with the requirements of the authority having jurisdiction or in the absence of such requirements with the National Electr...

Page 24: ...ire 1 to the 4006A 2 Run wire 2 to the L2 terminal on the 7248U instead of connecting to wire 4 3 Run wire 4 to the B2 terminal on the 7248U instead of connecting to wire 2 4 Run wire 5 to the B1 term...

Page 25: ...ust be done in accordance with applicable state local and national codes Use only copper conductors LINE HONEYWELL 7248U BLACK WHITE BROWN YELLOW RED RIELLO OIL BURNER CS HEATMANAGER 7248U CONTROL WIR...

Page 26: ...Page 26 NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors RIELLO OIL BURNER SR504 CONTROL WIRING WITH DHW PRIORITY...

Page 27: ...Page 27 NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors RIELLO OIL BURNER AZ 4P CONTROL WIRING WITH DHW PRIORITY...

Page 28: ...NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors Page 28 CARLIN OIL BURNER SR501 CONTROL WIRING WITH DHW PRIORITY...

Page 29: ...Page 29 NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors BECKETT NO AFII OIL BURNER ARM 4P CONTROL WIRING WITH DHW PRIORITY...

Page 30: ...Note 2 All wiring must be done in accordance with applicable state local and national codes Use only copper conductors Page 30 11 2 Gas Diagrams HEATWISE SU 2A SR503 CONTROL WIRING WITH DHW PRIORITY...

Page 31: ...NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors Page 31 RIELLO GAS BURNER AR861 2II CONTROL WIRING WITH DHW PRIORITY...

Page 32: ...a Low Water Cut Off is installed follow the manufactures suggested maintenance and test procedures 4 Adjust room thermostat so there is a call for heat and test boiler high limit for proper operation...

Page 33: ...__________ ______________________ _________________________ ______________________ Burner Manufacturer Type of Oil Burner Burner Model No Burner Serial No Nozzle Manufacturer Nozzle Spray Angle G P H...

Page 34: ...Page 34...

Page 35: ...Page 35...

Page 36: ...e responsible for 1 Components that are part of the heating system but were not manufactured by Biasi or QHT as part of the boiler 2 The workmanship of the installers of VEGA B 10 boilers Furthermore...

Reviews: