background image

10

Installation of DVF Make-up Air:

1.  Use 4 inch diameter flex pipe that is provided in the kit or a comparable single wall metal pipe. 

The maximum allowable length of intake pipe is twenty feet not including elbows.

2.  Begin installing the 4” tee to the burner (Riello requires the supplied 3” to 4” increaser to be 

installed first). Secure all joints on the intake with three screws each.  

3.  Install the supplied vacuum relief damper in the branch of the tee making sure that it is 

mounted with all labeling right side up and perfectly horizontal.  

4.  In the last run leg of the tee install the aluminum flex pipe.  

5.  Finally attach the other end of the flex pipe to the intake port on the concentric hood.

6.  Inspect the intake system and make sure all connections are secure and then seal each joint 

with silicone or aluminum tape.  

4.1 DVF-4 Installation of Make-Up Air

Installation of DVF Exhaust:

1.  Begin by locating a suitable location for the exhaust to breech the wall.  This location should 

be at least 12” above ground level or the expected snow level, and on the leeward side of the 

house.  Consult page 6 for required distances from windows, doors, etc. The hood location 

must also allow for a upward slope of a 1/4” per foot for the exhaust piping.   

2.  Once the hood location has been determined, cut a 8” hole for a non combustible wall, or a 

9” hole for a combustible wall.  Using 2” X 2”, Frame a box around the hole on the outside of 

the house so the flange is mounted away from the siding.  Attach the hood to the outside 

of the house using appropriate screws to support the hood.  Use one screw through each of 

the predrilled holes on the trim plate of the hood.  Do not drill or screw through the hood at 

all.

3.  Once the hood is secure, mock up the rest of the vent kit.  Start by fitting the boiler adapter 

onto the boiler and securing it in place with the locking band on the adapter.  Install the rest 

of the vent sections that are required to complete your job.  Connect the next piece of pipe 

by pushing the female end of the pipe over the male end of the boiler adapter. Once the 

pipe is fully seated, twist the female end clockwise until the locking mechanism is engaged.  

Do not screw into the pipe or add sealant to the pipe as this could compromise the factory 

seal.  Continue in this way until the entire kit is complete from the boiler to the vent hood.  It 

is allowable to add extra sections of pipe to the vent kit up to 20 equivalent feet.  Each 90 

degree elbow is 3 equivalent feet and each 45 degree elbow is 1.5 equivalent feet.

4.  Once you are satisfied with the fit of the exhaust, make sure that the vent pipe is properly 

supported every three feet with a upward slope to the hood of 1/4” every foot.  

4.2 DVF-4 Installation of Exhaust / Termination

Summary of Contents for Direct Vent DVF-4 Rigid

Page 1: ...low the gas supplier s instructions If you can not reach your gas supplier call the fire department Installation and service must be performed by a qualified licensed installer service agency or the g...

Page 2: ...nt Kit Gas or Oil DVF 4 Rigid Vent Kit and Installation 4 9 DVF 4 Installation of Make Up Air 4 1 10 DVF 4 Installation of Exhaust Termination 4 2 10 DVF 4 Joint Assembly 3 3 8 DVF 4 Appliance Connect...

Page 3: ...l fire hazards Please read the literature and warranties supplied by the manufacturers of the various accessory equipment This equipment is warranted by the respective manufacturers not by Quincy Hydr...

Page 4: ...with those of influenza and the highest incidence of poisoning occurs at the onset of cold weather or during flu season A victim may not experience any symptoms only one symptom or a few symptoms Susp...

Page 5: ...ce technician or gas supplier DO NOT ATTEMPT TO START THE BURNER WHEN EXCESS GAS HAS ACCUMULATED WHEN THE UNIT IS FULL OF VAPOR OR WHEN THE COMBUSTION CHAMBER IS VERY HOT NOTE ALWAYS KEEP THE MANUAL F...

Page 6: ...Vent hood shall be installed 12 above ground level or 12 above nominal snow level of the region of the installation which ever is higher 2 The Vent hood shall not be less than 3 feet above any forced...

Page 7: ...3 DVO Flexible Vent Kit and Installation Vent Installation 1 Vent Pipe bend radius is 12 minimum 2 Support vent pipe with metal strapping every 36 3 Maximum wall thickness is 14 Call Z Flex for recom...

Page 8: ...From outside the building insert the outer section through the wall until it rests against the wall Position the outer section so that the air intake is on the bottom Secure to outer wall using four...

Page 9: ...und the flue collar and slide on adaptor and tighten gear clamp 4 Seal the seam on the adaptor 5 Slide the terminal inner section over the terminal outer section and secure by tightening the gear clam...

Page 10: ...on to the outer sleeve to complete the joint assembly 3 3 DVO Joint Assembly APPLIANCE CONNECTION 1 Connect the appliance adapter to the appliance collas as per joint assembly 2 Apply Sealant around...

Page 11: ...e provisions do not exist for the ducting of combustion products to the outside The direct vent connector shall not pass through any floor or ceiling The burner exhaust must be ducted directly to the...

Page 12: ...s been determined cut a 8 hole for a non combustible wall or a 9 hole for a combustible wall Using 2 X 2 Frame a box around the hole on the outside of the house so the flange is mounted away from the...

Page 13: ...electrically bonded to ground in accordance with the requirements of the authority having jurisdiction or in the absence of such requirements with the National Electrical Code ANSI NFPA 70 or Canadian...

Page 14: ...hould be set to 12 5 CO2 To ensure proper burner setup gauges should be used to check things such as the pump pressure CO2 levels CO levels etc Gas 1 Checking the electrode orifice size and flame rod...

Page 15: ...er Model EZ Select EZ Select EZ Select EZ Select Firing Rate 50 78 1 06 1 33 Insertion Depth 3 0 3 0 3 0 3 0 Nozzle 40x45 65X70 85X60 1 00X60 Spray Pattern A A A B Pump Pressure 155 psi 150 psi 150 ps...

Page 16: ...am and controls To determine how much gas is coming into the burner or to set the gas meter correctly the following formula can be used The chart to the right can be used to determine the flow rate de...

Page 17: ...r the tee before the combination gas valve When installing the boiler make sure a pipe compound resistant to the action of liquefied petroleum is used Check piping for leaks Always check leaks with a...

Page 18: ...16 8 Wiring Oil Burners NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors...

Page 19: ...17 9 Wiring Gas Burners NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors...

Page 20: ...n to inspect the appliance and to replace any part of the control system and any gas control which has been under water OPERATING INSTRUCTIONS 1 STOP Read the safety information above 2 Set thermostat...

Page 21: ...er of any debris with brush and vacuum 4 Remove smoke pipe and clean out debris from cleaning or soot build up 5 Inspect smoke pipe for any corrosion before reinstalling Replace if necessary 6 Consult...

Page 22: ...mp Room Temp Ambient Net Stack Temp CO2 O2 Smoke Reading Combustion EFF System Checklist Boiler Model Serial Original Purchaser Installer Burner Checklist Burner Manufacturer Burner Fuel Type Burner M...

Page 23: ...21 13 Installer Notes Continued Comments Notes...

Page 24: ...HVAC products sold to wholesale distributors in the U S and Canada Customer service and support are the key to QHT s business From troubleshooting radiator piping to working through problems with wal...

Reviews: