QIAreach eHub User Manual 10/2020
15
4
Installation Procedures
4.1
Site requirements
Select a flat, dry, and clean workbench space for the QIAreach eHub. Make sure that the space is
free of excessive moisture and dust, protected from direct sunlight, large temperature fluctuations,
heat sources, vibration and electrical interference. Refer to Section 9 for the weight and dimensions
of the QIAreach eHub and the correct operating conditions (temperature and humidity). There
should be sufficient clearance on the workbench to allow unimpeded access to the eStick connection
ports, USB port, and
ON/OFF
button.
Note
: Before installing and using the QIAreach eHub, see Operating the QIAreach eHub to become
familiar with the QIAreach eHub operating conditions.
CAUTION
Do not place the QIAreach eHub in close proximity to sources of strong
electromagnetic radiation (e.g., unshielded intentional RF sources), as
these can interfere with proper operation. For more information, see
FCC Compliance: Supplier’s Declaration of Conformity.
(C2)