QIAsymphony SP/AS Consolidated Operating Guide 12/2017
27
Preparing the QIAsymphony SP/AS before startup
Important
An empty unit box must be placed into slot 4 of the “Reagents and
Consumables” drawer because, during initialization, the handler goes down into
the unit box in position 4. If the unit box is not empty, the handler will crash.
1.
Make sure that the liquid waste bottle, waste bags, and waste containers are empty.
2.
Make sure that all drawers and both hoods are closed. If the hood(s) is opened during
instrument startup, the system test will fail.
After successful startup, QIAsymphony SP/AS instruments are ready for use. The
Sample
Preparation
screen will be displayed.
Note that the image above was made with a QIAsymphony SP instrument (not a
QIAsymphony SP/AS instrument).
Important
Before using the QIAsymphony SP/AS, the user must log in.
For information about user accounts, see Section 4.2.
3.3.2
Logging out
After pressing the
Run
button, you have the option to log out. The run will continue.
Summary of Contents for QIAsymphony SP
Page 213: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 213 This page intentionally left blank...
Page 214: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 214 This page intentionally left blank...
Page 216: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 216 www qiagen com...