3
QLogic 12000
Quick Start Guide
Installation Instructions
This guide describes the steps to install and activate a 12000-series InfiniBand switch. For detailed instructions, refer
to the
QLogic 12000 Hardware Installation Guide
.
NOTE:
For the 12005-PT16, please consult your modular blade enclosure documentation for detailed installation
instructions.
Step 1. Check the Packing List
1.
Verify all ordered equipment has been received. The 12000 switches ship with all components
pre-installed. The following table lists the maximum configuration of installed components for each
switch:
Table 1. 12000-Series Components
Component
12200
12300
12400-6/12
12800-040
12800-120
12800-180
12800-360
Fans
N/A
N/A
N/A
4 Intake
5 Intake
3 Exhaust
5 Intake
3 Exhaust
10 Intake
10 Exhaust
Power
Supplies or
Blank Fillers
N/A
2
Power/
Fan units
2
Power/
Fan units
4
4
6
12
IB Leaf
Modules/
Blanks
N/A
N/A
N/A
4
12
18
36
Spine
Modules/
Blanks
N/A
N/A
N/A
1
3
5
9
Management
Modules/
Blanks
N/A
N/A
N/A
2
2
2
2
I/O Modules
N/A
N/A
1/2
N/A
N/A
N/A
N/A
Hardware
Installation
kit (mounting
rails, etc.)
1
1
1
1
1
1
1
DB-9 to
RJ-11
adapter
N/A
1
1
2
2
2
2
Summary of Contents for InfiniBand 12200-BS01
Page 10: ...10...