2–Planning
Performance Tuning
2-6
ISR651101-00 G
Table 2-4. OC-3—156Mbps
Round-Trip Delay (ms)
TCP Window Size (bytes)
≤
0.4
8
≤
0.8
16
≤
1.6
32
≤
3.3
64
≤
6.6
128
≤
13.2
256
≤
26.3
512
≤
52.7
1024
≤
105.4
2048
≤
210.7
4096
Table 2-5. OC-12—621Mbps
Round-Trip Delay (ms)
TCP Window Size (bytes)
≤
0.1
8
≤
0.2
16
≤
0.4
32
≤
0.8
64
≤
1.6
128
≤
3.3
256
≤
6.6
512
≤
13.2
1024
≤
26.3
2048
≤
52.7
4096
Summary of Contents for iSR6200
Page 1: ...ISR651101 00 G iSR6200 Intelligent Storage Router Installation Guide ...
Page 20: ...Preface Technical Support xx ISR651101 00 G ...
Page 34: ...1 Introduction iSR6200 Router Blades 1 14 ISR651101 00 G ...
Page 60: ...3 Installation Installing New Firmware 3 18 ISR651101 00 G ...
Page 90: ...4 Configuration Controlling per Host LUN Access on the iSR6200 4 30 ISR651101 00 G ...
Page 110: ...5 Fibre Channel over IP Configuring FCIP 5 20 ISR651101 00 G ...
Page 128: ...7 Removal and Replacement Power and Cooling Modules 7 14 ISR651101 00 G ...
Page 134: ...A Technical Specifications Environmental and Safety A 6 ISR651101 00 G ...
Page 160: ...B Simple Network Management Protocol Notifications B 26 ISR651101 00 G ...
Page 217: ......