5–Fibre Channel over IP
Configuring FCIP
5-2
ISR651101-00 G
Links up to two locations per blade, four locations per chassis (two blades)
FICON
®
support
Configuring FCIP
To successfully configure FCIP, you need to assess both the SAN and WAN
environments. The following list is provided to support the assessment.
Extension port type:
E_Port—See
“E_Port Extension” on page 5-5
2.2 for a description and
examples.
F_Port—See
“F_Port Extension” on page 5-7
for a description and
examples.
For E_Ports, the number of ISLs (inter-switch links):
One
Two
WAN characteristics:
Round-trip time (RTT)—See
Data rate—See
Quality—See
Firewall—See
Available WAN bandwidth—See
“Bandwidth Limiting” on page 5-14
provides space for you to write down the information that you must
obtain prior to configuring an FCIP route.
Summary of Contents for iSR6200
Page 1: ...ISR651101 00 G iSR6200 Intelligent Storage Router Installation Guide ...
Page 20: ...Preface Technical Support xx ISR651101 00 G ...
Page 34: ...1 Introduction iSR6200 Router Blades 1 14 ISR651101 00 G ...
Page 60: ...3 Installation Installing New Firmware 3 18 ISR651101 00 G ...
Page 90: ...4 Configuration Controlling per Host LUN Access on the iSR6200 4 30 ISR651101 00 G ...
Page 110: ...5 Fibre Channel over IP Configuring FCIP 5 20 ISR651101 00 G ...
Page 128: ...7 Removal and Replacement Power and Cooling Modules 7 14 ISR651101 00 G ...
Page 134: ...A Technical Specifications Environmental and Safety A 6 ISR651101 00 G ...
Page 160: ...B Simple Network Management Protocol Notifications B 26 ISR651101 00 G ...
Page 217: ......