5–Fibre Channel over IP
Configuring FCIP
5-6
ISR651101-00 G
Figure 5-1. E_Port Extension, Single ISL
shows an example of a two FCIP routes (dual ISLs). This example
assumes that the Fibre Channel switches have the ability to load-balance
between the ISLs to enhance performance.
Figure 5-2. E_Port Extension, Dual ISLs
LAN/WAN
Local Router
Remote Router
Fibre Channel Switch
Fibre Channel Switch
Local Storage Array
Remote Storage Array
LAN/WAN
Fibre Channel Switch
Fibre Channel Switch
iSR6240 Router
iSR6240 Router
Summary of Contents for iSR6200
Page 1: ...ISR651101 00 G iSR6200 Intelligent Storage Router Installation Guide ...
Page 20: ...Preface Technical Support xx ISR651101 00 G ...
Page 34: ...1 Introduction iSR6200 Router Blades 1 14 ISR651101 00 G ...
Page 60: ...3 Installation Installing New Firmware 3 18 ISR651101 00 G ...
Page 90: ...4 Configuration Controlling per Host LUN Access on the iSR6200 4 30 ISR651101 00 G ...
Page 110: ...5 Fibre Channel over IP Configuring FCIP 5 20 ISR651101 00 G ...
Page 128: ...7 Removal and Replacement Power and Cooling Modules 7 14 ISR651101 00 G ...
Page 134: ...A Technical Specifications Environmental and Safety A 6 ISR651101 00 G ...
Page 160: ...B Simple Network Management Protocol Notifications B 26 ISR651101 00 G ...
Page 217: ......