background image

5

Step 4. Install Transceivers

An SFP transceiver is required for each SFP port that will be connected to a device or another switch. The SFP ports 
support 2Gbps, 4Gbps, and 8Gbps transmission. The XPAK ports support 10Gbps transmission and can be upgraded 
to 20Gbps with a license key.

The standard switch model activates SFP ports 0–7 plus the XPAK ports (20–23). You can activate ports 8–19 in four-port 
increments with the purchase of a Port Activation license key. Contact your authorized reseller for information about 
license keys.

NOTE:

If your QLogic 5802V Switch came with 20 SFPs and a 3-inch stacking cable, ports 0–23 are active. 

To install an SFP transceiver, insert the transceiver into the switch port and gently press until it snaps in place. The 
transceiver will fit only one way. If the transceiver does not install under gentle pressure, flip it over and try again.

Step 5. Apply Power to the Switch

Attach the AC power cord(s) to the switch and wall 
outlet or power strip. For greater availability, connect 
the power cords to separate power circuits. Verify that 
the Input Power LED is illuminated.

The switch runs its self-tests and begins normal 
operation—this may take a few minutes. Verify that 
the Heartbeat LED is blinking (once per second) and 
the System Fault LED is NOT illuminated.

Step 6. Verify Workstation Requirements

Verify that your workstation can support the QuickTools™ application with the following minimum requirements:

Windows 2003 and XP SP1/SP2

512MB memory minimum; 1GB recommended

1GHz processor

Video card with 256 colors

RJ-45 Ethernet port

Internet Browser: Microsoft

®

 Internet Explorer

®

 6.0 and later, Netscape Navigator

®

 6.0 and later, Firefox

®

 

1.5 and later, or Mozilla

®

 1.5

The default IP address of a new switch is 10.0.0.1. Ensure that your workstation is configured to communicate 
with the 10.0.0 subnet.

Step 7. Connect the Workstation to the Switch

Connect the workstation to the switch using an Ethernet cable—the switch automatically recognizes both straight 
and cross-over Ethernet cables. If you are using a Windows workstation, you must have a live Ethernet connection 
when the workstation powers up.

INPUT POWER 

LED

HEARTBEAT 

LED

SYSTEM 

FAULT LED

Summary of Contents for QLogic Fibre Channel Switch

Page 1: ...Quick Start Guide Q U I C K S T A R T G U I D E z F I B R E C H A N N E L S W I T C H I N S T A L L A T I O N...

Page 2: ...assistance QLogic Technical Support can be reached by the following methods Web http support qlogic com E mail support qlogic com The QLogic knowledge database contains troubleshooting information fo...

Page 3: ...e Fibre Channel Switch 1 AC power cord 5800V 2 AC power cords 5802V 4 Rubber feet 1 Enterprise Fabric Suite CD free 30 day trial Depending on which QLogic 5800V Series Switch you ordered it may also i...

Page 4: ...and one 9 inch stacking cable For a 4 switch stack use three 3 inch stacking cables and three 9 inch stacking cables For a 5 switch stack use four 3 inch stacking cables and six 9 inch stacking cable...

Page 5: ...ater availability connect thepowercordstoseparatepowercircuits Verifythat the Input Power LED is illuminated The switch runs its self tests and begins normal operation this may take a few minutes Veri...

Page 6: ...administrator Open the QuickTools Wizards menu and select Configuration Wizard Follow the instructions to set network parameters and the password The default user name is admin the default password i...

Page 7: ...ds Mozilla and Firefox are registered trademarks of the Mozilla Foundation Netscape Navigator is a registered trademarks of Netscape Communications Corporation Java and Solaris are registered trademar...

Page 8: ...0861 03 A Corporate Headquarters International Offices QLogic Corporation UK Ireland Germany 26650 Aliso Viejo Parkway India Japan China Aliso Viejo CA 92656 Hong Kong Singapore Taiwan 949 389 6000 ww...

Reviews: