4 – Installation
Installing a Switch
4-2
59225-00 B
S
4.1.2
Switch Power Requirements
Power requirements are 0.25 Amp at 120 VAC or 0.125 A at 240 VAC.
4.1.3
Environmental Conditions
Consider the factors that affect the climate in your facility such as equipment heat
dissipation and ventilation. The switch requires the following operating conditions:
Operating temperature range: 5 – 40°C (41 – 104°F)
Relative humidity: 15 – 80%, non-condensing
4.2
Installing a Switch
Unpack the switch and accessories. The SANbox 1400 Series product is shipped
with the following components:
SANbox 1400 Series Fibre Channel Switch (1) with firmware installed
Power supply (1)
Power cord (1)
Rubber feet (4)
CD-ROM containing the SANsurfer Switch Manager switch management
application, release notes, and documentation.
Installing a SANbox 1400 Series switch involves the following steps:
1.
Mount the switch.
2.
Install transceivers.
3.
Connect the management workstation to the switch.
4.
Configure the management workstation.
5.
Install the management application.
6.
Start the management application.
7.
Connect the switch to the AC power source.
8.
Configure the switch.
9.
Cable devices to the switch.
Summary of Contents for SANbox 1400 Series
Page 26: ...1 Introduction Technical Support 1 18 59225 00 B S Notes...
Page 46: ...3 Planning Fabric Management 3 10 59225 00 B S Notes...
Page 88: ...A Specifications Regulatory Certifications A 6 59225 00 B S Notes...
Page 200: ...B Command Line Interface Zoning Command B 112 59225 00 B S Notes...
Page 206: ...SANbox 1400 Series Fibre Channel Switch Installation Guide Glossary 6 59225 00 B S Notes...
Page 214: ...SANbox 1400 Series Fibre Channel Switch Installation Guide Index 8 59225 00 B S Notes...