Sign-in-China.com
Online Wholesale for AD & Signage Products
Learn More >>
- 28 -
4.
Remove the entire block bearing set and heater;
5.
Remove the collars on left cabinet;
6.
Take off the roller;
7.
Install new roller;
8. Repeat the previous step to install machine.
8.2 Cleaning
1. To extend the lifetime of the machines, please ensure the machine are clean.
2. Make sure environment clean and keep away from obstacles.
8.3 Checking
In order to ensure your safety, please check the safety of the machine regularly. If you find
failures in the check, please refer to the section of Trouble shooting and solution. If you
need to reset the pressure, please refer to the section of Pressure setting.
8.3.1 Visual Checking
Visual checking prior to maintenance.
1. power supple cable undamaged.
2. Caster is stable.
3. Any damage on machine