XCubeFAS Series
Hardware Manual
Installing the System Hardware
© 2021 QSAN Technology, Inc. All rights reserved.
www.qsan.com
Official
Document
32
Figure 3-9 Install a Tray into the System and Lock the Release Button Lock (SFF)
Connecting Power Cords and Powering ON the
System
Before you power on your XCubeFAS system for the first time, please make sure following
tasks are done:
▪
Check the power cord type. The power cords for the XCubeFAS series will vary
depending on your country/region. If you find the power cords included with your
XCubeFAS
system doesn’t match your current country/region, you may need
to
buy an adapter for each power cord to connect the power outlet.
Power cord ratings:
▪
100
–
127V~ 10A
▪
200
–
240 V~ 5A
▪
Install all disk drives in the system so the controllers can identify and configure
them at power-up.
▪
Connect cables that connect the management port and data ports to your
network, and then power cords to the system; finally press the power button
once to power on the XCubeFAS.