background image

E

DETAIL E

SCALE 1 : 5

MAST 

REAR VIEW

CHARGER

BRACKET

5/16-18

HEX NUT

5/16-18

HEX BOLT

BOTTOM OF

BRACKET TO 

BE INSTALLED

15 1/2" ABOVE

BATTERY BOX.

BATTERY 

CHARGER

         NOTE:

         SLIDE (6) HEX HEAD BOLTS

         IN CHANNEL ON REAR OF 

         MAST. THESE BOLTS WILL BE 

         USED TO ATTACH CHARGER 

         BRACKET, TOOL TRAY AND

         HANDLE.

G

DETAIL G

SCALE 1 : 7

CONTROL BOX

BATTERY METER

HANDLE

TOOL TRAY

5/16-18 BOLT

AND NUT

UP-DOWN

SWITCH

STEP #5 BATTERY CHARGER INSTALLATION

STEP #6 TOOL TRAY AND HANDLE INSTALLATION.

INSTALL TOOL TRAY AND

1.

         HANDLE TO DESIRED HEIGHT.

TIGHTEN ALL FASTENERS.

2.

INSTALL COVERS ON BATTERY BOX.

3.

Reviews: