QT Technologies LLC
QT Technologies LLC (303) 444-3590 FAX (303) 444-8736 Page 17
4. The terminal pedestal has been mounted with all appropriate conduits stubbed up to the shelf. (The
access doors face to the rear - check with QT Technologies if you need to deviate from this)
Completed on ___/___/___ by _____________
5. Each tank has fuel in the tank for testing purposes. We will also need somewhere to pump the fuel
within the reach of the hose. Usually back into the tank, a fuel truck, boat, or a plane.
Completed on ___/___/___ by _____________
6. The system has been pressure tested for leaks all the way to the end of the hose.
Completed on ___/___/___ by _____________
7 The site preparation has been completed in compliance with the above checklist. Any deviations
from these requirements have been discussed with, and approved by a QT Technologies technician.
The site preparation has been completed in compliance with the above checklist.
____________________________________________________
Signature Date
____________________________________________________
Name (Please Print)
____________________________________________________
Company Phone Number
Site Name : __________________________________________