Installation
To install, locate 2 HP of space in your Eurorack case and con,rm the positive
12 volts and negative 12 volts sides of the power distribution lines. Plug the
connector into the power distribution board of your case, keeping in mind that the
red band corresponds to negative 12 volts. In most systems the negative 12 volt
supply line is at the bottom. The power cable should be connected to the EON with the
red band facing the bottom of the module.
Specications
Format:
2 HP Eurorack module
Depth:
46mm (Skiff Friendly)
Max Current:
+12V = 60mA
-12V = 10mA
4