background image

March 28, 2012

7037-141B

Page  5

R

2100 & 4300 Millennium ACC Wood Burner

CORNER POSITIONING

(45

˚

)

 

1.QF.1C

 

D

raw

in

not to s

ca

le

 

 

 

 

 

C

 

Fig. 4

 

 

 

A

 

 

 

 

 

D

 

 

 

C

 

A

 

 

 

B

 

 

E

 

 

 

F

 

 

D

 

 

 

 

 

 

 

 

 

 

Table 2

 

 

DESCRIPTION

 

Pioneer Double Flue Mounted Shield Universal

 

Shall be Fitted

 

With Double Flue

 

Shield Fitted

 

 

2100

 

4300

 

A

 

Min. clearance from firebox to corner walls

 

230

 

250

 

B

 

Min. distance from firebox to floor protector front

 

300

 

300

 

C

 

Min. distance from rear wall to front of protector

 

1280

 

1380

 

D

 

Min. floor protector projection from wall

 

860

 

910

 

E

 

Min. overall floor protector depth

 

1510

 

1620

 

F

 

Min floor protector front width

 

594

 

660

 

 

 

 

 

 

 

FIREBOX INSTALLATION

 

 

 

 

1.   If a separate floor protector is being used position now. Place the firebox on the floor protector to 

suit the minimum installation clearances. (See Fig 3 or 4).

 

2.  Seismically restrain the firebox and the floor protector to the floor.

 

3.  Fit 2 x 6mm fixings suitable for the floor material. DO NOT over tighten.

 

4.  Fit timber trim pedestal edging to front and back of base (

optional

).

 

CORNER POSITIONING (45°)

DESCRIPTION

Pioneer Double Flue Mounted Shield Universal

Shall be Fitted

With Double Flue Shield Fitted

2100-NZ

2100-AU

4300

A

Min. clearance from firebox to corner walls

230

 210

250

B

Min. distance from firebox to floor protector front

300

300

300

C

Min. distance from rear wall to floor protector front

1280

1228

1380

D

Min. floor protector projection from wall

860

808 

910

E

Min. overall floor protector depth

1510

 1440

1620

F

Min. floor protector front width

594

 594

660

Summary of Contents for 21M-ACC-NZ

Page 1: ...a ceiling angle greater than 30 refer to Fig 6 7 and AS NZS 2918 2001 4 6 3 b Ceiling Plate may vary in size depending on ceiling angle Please specify ceiling pitch prior to ordering the ceiling plate...

Page 2: ...mm 660mm 247mm 330mm C L 292mm 527mm 406mm C L L C 729mm 668mm 170mm 108mm Outside Air Connection Fig 2 Quadra Fire 4300 Millenium ACC Wood Burner Dimensions roomfor 14x 875 S N 1 5 x 375BarcodeLabel...

Page 3: ...ONFACTORBURNINGSOFTWOOD WHENTESTEDINACCORDANCEWITHAS NZS4013 MAXIMUMAVERAGEHEATOUTPUTBURNINGSOFTWOOD APPROVEDFUEL WETBACK ALLMODELS MANUFACTUREDBY PERFORMANCEMAYVARYFROMTESTVALUESDEPENDINGONACTUAL OPE...

Page 4: ...0 4300 A Min clearance from firebox to rear wall 150 200 B Min clearance from firebox to side wall 550 400 C Min distance from firebox opening to floor protector front 300 300 D Min distance from fire...

Page 5: ...is being used position now Place the firebox on the floor protector to suit the minimum installation clearances See Fig 3 or 4 2 Seismically restrain the firebox and the floor protector to the floor...

Page 6: ...t roof penetration see NZ Building Code E2 Acceptable Solution from 01 07 05 5 Install the outer casing so that i lower end is flush with the underside of the ceiling material and ii with the addition...

Page 7: ...sing cover is necessary minimum 25mm gap between flue pipe casing combustible material Non combustible material Hebel block or 12mm Promina board or similar under the flashing 25 25 Approved Flashing...

Page 8: ...b Fig 4 6 downward distance of casing and 3 x flue distance of the ceiling plate ADD Cowl Casing Cover Spider Bracket Approved Flashing A Ceiling Plate Batten A 3 x flue pipe Ceiling flue pipe Fig 7...

Page 9: ...legs from the bracket 5B leaving the entral tongue to locate inside the flue outlet only Two tabs are provided and if folded back at 90 degrees the bracket and Flue Mounted Shield will mount lower ont...

Page 10: ...MANUFACTURER SHOULD BE CONSULTED IN THE FIRST INSTANCE CAUTIONS CRACKED AND BROKEN COMPONENTS e g GLASS PANELS OR CERAMIC TILES MAY RENDER THE INSTALLATION UNSAFE WARNING ANY MODIFICATION OF THE APPLI...

Page 11: ...March 28 2012 7037 141B Page 11 R 2100 4300 Millennium ACC Wood Burner Homeowner Notes...

Page 12: ...Page 12 7037 141B March 28 2012 R 2100 4300 Millennium ACC Wood Burner Service And Maintenance Log Date of Service Performed By Description of Service...

Page 13: ...ACC STOVE DO NOT DISCARD THIS MANUAL CAUTION Important operating and maintenance instruc tions included Leave this manual with party responsible for use and operation Read understand and follow these...

Reviews: