August 3, 2015
7037-135L
Page 37
4300 Wood Stove Series (ACC)
F. Tube Channel Assembly Replacement
Removing Tube Channel Assembly
1. Remove the right side shield by removing 2 screws in the
back using a Phillips head screw driver.
2. Remove 4 screws from channel access cover and remove
cover.
3. Locate 2 channel nuts inside of chamber and remove
using a 7/16 socket wrench. Slide out tube channel
assembly.
NOTE
: Soak the bolts with penetrating oil for at least 15 min-
utes before trying to remove them.
Replacing Tube Channel Assembly
1. Silde one gasket on each tube fi rst.
2. Slide the tube channel assembly into side of fi rebox and
insert each tube into the corresponding hole in the tube
channel rack starting with the back hole fi rst.
3. Make sure tube channel assembly is fl ush against the
side of the stove and secure with channel nuts.
4. Re-install channel cover and side shield.
Figure 37.1
NOTE: Service Space
In order to replace the tube channel assembly a clearance
of 19 inches (483mm) is required on the right side of stove
in order to remove the tubes with the stove in place.
If space is not available, the stove will have to be discon-
nected from the chimney to proceed with the tube replace-
ment.
Summary of Contents for 4300 Series
Page 40: ...Page 40 7037 135L August 3 2015 ...
Page 41: ...August 3 2015 7037 135L Page 41 ...
Page 42: ...Page 42 7037 135L August 3 2015 ...
Page 43: ...August 3 2015 7037 135L Page 43 ...
Page 45: ...August 3 2015 7037 135L Page 45 ...
Page 46: ...Page 46 7037 135L August 3 2015 ...
Page 47: ...August 3 2015 7037 135L Page 47 ...
Page 48: ...Page 48 7037 135L August 3 2015 ...
Page 49: ...August 3 2015 7037 135L Page 49 ...
Page 50: ...Page 50 7037 135L August 3 2015 4300 Wood Stove Series ACC C Warranty Policy ...
Page 51: ...August 3 2015 7037 135L Page 51 4300 Wood Stove Series ACC ...