10/08
Page 29
Quadra-Fire • Columbia Bay • 250-5195 Rev. K
Figure 8.4
Holding both sides of the metal refractory brick
piece, pull slightly together and rotate out of the firebox.
INSTALL NEW BRICK SET
Figure 8.5
Install rear panel, gently wedging it between sup-
port shelf and baffle base.
Install the brick brackets that are
enclosed with the brick set.
Figure 8.6
Install the left and right brick panels. Use the screw
placement shown in
Figure 8.3
to secure them in place.
Reassemble appliance.
E. Positioning the Logs
While still breakable, the logs do not become fragile until
after the appliance is burned and they have cured. After
curing, any handling must be done with care as breakage
can easily occur.
PLEASE NOTE: Logs have been designed to work
specifically with the burner of this appliance. Exact
placement will ensure proper operation of your gas
appliance and reduce sooting.
Figure 8.7
The three piece log set is packed in the compo-
nents box and consists of the following:
1
2
3
4
Qty.
Description
#
1
Rear Log
1
1
Left Front Log
2
1
Right Front Log
3
1
Twig
4
Figure 8.8
Insert locator pin in rear log.
Insert rear log onto
log pan over stud.
Locater Pin.