R
December 6, 2011
7051-158B
Page 29
EDGE 60 Pellet Fireplace
F. Finishing Material
It is important that the fi nishing material is determined before
the appliance is secured to the fl oor. Depending on the fi n-
ishing material and installation method, the appliance may
need to be positioned further in or out of the wall.
There are three ways fi nishing material can be applied:.
1. Behind the mounting frame
2. Flush with the mounting frame
3. Protrudes beyond the mounting frame
1. Behind the Mounting Frame
The mounting frame is designed to have a 1/2 inch (13mm)
overlap on the sides and the top of the framing opening.
Figure 28.1.
NOTICE:
Non-combustible material is not needed to fi nish
this appliance.
Positioning the nailing fl anges:
• Slide the nailing fl anges all the way to the front and this
will set the appliance for 1/2 inch (13mm) sheet rock.
• If tile, marble or other fl at surface fi nish material is desi-
ered and you want the mounting frame to cover the cut
edge, set the nailing fl anges at a dimension of the sheet
rock thickness plus the fi nishing material thickness.
Figure 28.2.
Example: Sheetrock = 1/2 inch (13mm)
Finish Material = 3/8 inch (9.5mm)
Move fl ange: 7/8 inch (22.5mm)
2. Flush with the Mounting Fram
e
The fi nish material can not be thicker than 1-1/2 inches
(38mm) to use this method.
Figure 28.3.
• Set the nailing fl anges for sheet rock thickness and
install the appliance.
• Install the mounting frame.
• Install the fi nishing material to edge of the mounting
frame.
3. Protrudes Beyond the Mounting Frame
This method is mainly used for a brick or stone installa-
tion. When fi nishing material is protrudes of the mounting
frame and front, there must be a 1-1/4 inch (32mm) airfl ow
clearance in front of the mounting frame.
Figure 28.4.
Use the masonry spacer supplied with the Front to position
the fi nishing material at the proper dimension. Remember
to keep the Front opening clearances in mind when fi nishing
material is protrudes of the Front.
(See pages 29-30)
.
• Set the nailing fl anges for sheet rock thickness and
install the appliance.
• Install the mounting frame.
• Install the fi nishing material to edge of the mounting
frame.
•
Complete the installation following all specifi ed clear-
ances to combustibles.
Figure 28.1.
Figure 28.2
Figure 28.3.
Figure 28.4.
Adjustable Nailing Flange
Adjustment Screw
Front of Fireplace
7/8 in
(22.5mm)
Mounting Frame
Finishing Material Behind
the Mounting Frame
Mounting Frame
Finishing Material Flush
with Mounting Frame
Door Frame
Finishing Material Beyond Door Frame
Maintain 1-1/4 inch (32mm) air
clearance in front of door frame
Masonry Spacer