Quadra-Fire • QV36DC-A • 2161-900 Rev. B • 10/08
32
Placing the Ember Material
• Release the four glass latches on the glass frame. Re-
move glass door from the unit.
•
Glowing Ember
material can be placed without remov-
ing logs. Place a single layer of dime size and thickness
pieces on exposed area of burner front and burner
center. Starting in front of two center logs place one
row at a time, completely surrounding all ports in front
of middle logs including those that extend under front
logs.
DO NOT
press ember material down into ports or
place more than a single layer on burner. Do not place
embers on or near ports behind front logs.
CAUTION: DO NOT COVER BURNER PORTS WITH
EMBER MATERIAL.
Shutter Settings
NG
LP
Burner
Full Open
Full Open
• Save the remaining ember materials for use during
fi replace servicing.
• Replace the glass door.
• Pull out and latch the glass clips into the glass frame.
• Install a decorative front.
Glass Specifi cations: CERAMIC
Positioning the Logs
Refer to the included log instructions.
Step 11. Before Lighting the Fireplace
Before
lighting the fi replace, be sure to do the following:
Remove all paperwork from underneath the fi replace.
Check that log retaining rubber bands have been
removed!
Review safety warnings and cautions
• Read
the
Safety and Warning Information
section at
the beginning of this
Owner’s Manual
.
Double-check for gas leaks
• Before lighting the fi replace, double-check the unit for
possible gas leaks.
Double-check vent terminations and front grilles for
obstructions.
• Before lighting the fi replace, double-check the unit for
possible obstructions that could be blocking the vent
terminations or the front grilles.
Double-check for faulty components
• Any component that is found to be faulty
MUST BE
replaced with an approved component. Tampering with
the fi replace components is
DANGEROUS
and voids all
warranties.
A small amount of air will be in the gas supply lines.
When fi rst lighting the fi replace, it will take a few minutes
for the lines to purge themselves of this air. Once the
purging is complete, the fi replace will light and will operate
normally.
Subsequent lightings of the fi replace will not require this
purging of air from the gas supply lines,
unless
the gas
valve has been turned to the OFF position
, in which
case the air would have to be purged.
NOTE:
The fi replace should be run 3 to 4 hours on the initial
start-up. Turn it off and let it cool completely. Remove and
clean the glass. Replace the glass and run the fi replace
for an additional 8 hours. This will help to cure the product
used in the paint and logs.
During this break-in period it is recommended that some
windows in the house be opened for air circulation. This will
help avoid setting off smoke detectors, and help eliminate
any odors associated with the fi replace’s initial burning.
Step 12. Lighting the Appliance
You’ve reviewed all safety warnings, you’ve checked the
appliance for gas leaks, you know the vent system is
unobstructed, and you’ve checked for faulty components.
Now you’re ready to light the appliance.
Summary of Contents for QV36DC-A
Page 39: ......