B. Junction Box Installation
Figure 9.2 Junction box installation
JUNCTION
BOX
SIDEWALL
FEED PLUG
THROUGH HOLE
INSERT STRAIN RELIEF
AROUND CORD IN THIS END
FROM OUTSIDE OF UNIT
SCREW
PROVIDED
Optional Accessories
Connecting the electrical junction box is required if using
a blower or remote.
• Plug the cord into a convenient outlet.
• An electrician may install an outlet box inside the
fi replace. Place the outlet in the lower, back corner of
the fi replace.
• Must use cord supplied.
C. Installation for Fan (Optional)
On units already installed removal of decorative front,
surround and gas insert is required.
• Detach fl exible liner from back of unit if insert is installed.
• Remove the four screws on the cover plate (see Figure 9.3).
Figure 9.3
FAN
COVER
PLATE
POWER
CORD
GROUND
WIRE
• Bend up the tabs on the base pan (see Figure 9.4).
• Place the blower in between the bend up tabs.
• Install and wire the blower per instruction shipped with
the fan.
• The ground wire of the fan can clip on the side of the
base pan.
• Reinstall the cover plate back on the unit. Make sure the
fan does not make contact with the back wall to prevent
noise from vibration.
CAUTION
Label all wires prior to disconnection when servicing controls.
Wiring errors can cause improper and dangerous operation.
Verify proper operation after servicing.
Shock hazard.
• Replace damaged wire with type 105º C rated
wire.
• Wire must have high temperature insulation.
WARNING