background image

11

A. Put on safety glasses. Using a stud finder (following manufactures instructions) follow rafter board mounting line

     marks to locate rafters. Mark the center of the ceiling rafters. Drill 7/32 holes in a straight line square to the rafters

     (framing square is recommended). Space Front to Back holes to board mounting hole spacing.                                      

STEP 2: DRILL CEILING RAFTER ATTACHMENT POINTS

B. Drill Mounting Boards: 

     Measure center-to-center distance between 7/32”

     rafter holes. Mark distance on mounting boards. 

     Mark drill points along mounting board and Drill 5/16”

     holes completely through the mounting boards.

C. Attach mounting boards using 5/16” lag bolts and

     washers (not included) to Rafters. Allow room for

     mounting 2”x 4” towards front wall. Mark drill

     points with pencil along the center of board. Drill

     5/16” holes completely through the mounting boards.

     Attach mounting boards to ceiling.

Summary of Contents for Quadratop 12020-2000

Page 1: ...K Organizer Plate x2 L Organizer Pulley x2 REQUIRED TOOLS LIST Safety Glasses Tape Measure Step Ladder Drill Drill Bits 5 32 7 32 5 16 Plum Line Pencil Stud Finder 7 16 Wrench or Socket Framing Square...

Page 2: ...D RESULT IN A MINOR OR MODERATE INJURY YOU CAN BE MODERATELY HURT AND ALSO MAY SUFFER PROPERTY DAMAGE IF YOU DON T FOLLOW INSTRUCTIONS NOTICE 2 READ CAREFULLY BEFORE PROCEEDING DO NOT USE THIS PRODUCT...

Page 3: ...R 250 MILES AND FREQUENTLY THEREAFTER DO NOT USE IF DAMAGED NOTICE BEFORE STARTING INSTALLATION Determine the rafter direction Part 1 of instructions will be for front to Back Part 2 of instructions w...

Page 4: ...GARAGE DOOR WRONG C Correct location of mounting boards allows proper cleance for lifting ropes Lifting ropes should hange perpendicular to the ceiling Uneven rope spacing may not allow for level bal...

Page 5: ...top should be balanced while lifting C To insure a balanced system measure from door opening just ahead of side window to rear lift gate opening This measurment will be used to correctly space mountin...

Page 6: ...k Rafters B With vehicle hardtop centered left to right drop a plumb line from mounting board to rest at each side of vehicle Mark ceiling mounting board plumb line with pencil Pigtail lag bolts to be...

Page 7: ...g bolts Drill two 5 32 holes and mount 2 x 6 riser to rafter mounting board using two 1 4 Lag Bolts with washers STEP 4 INSTALLING ROPE ORGANIZER FOR RAFTERS Front to Back Rafters B Center one side of...

Page 8: ...2 Equals 3 will Equal 10 11 12 13 10 9 8 17 14 15 16 17 6 5 4 3 NOTE When distance 2 is much greater than 3 new longer drop rope will need to be purchased A Use stud finder to locate solid wood of top...

Page 9: ...YSTEM CAUSING LOAD TO FALL AND CAUSE AN ACCIDENT NOTICE MOUNTING BOARDS MAY NOT BE NECESSARY FOR INSTALLATION IN CEILINGS WITH EXPOSED RAFTERS IF RAFTERS ARE EXPOSED HOIST SYSTEM CAN BE MOUNTED DIRECT...

Page 10: ...ng board to rest at each side of vehicle Mark ceiling mounting board plumb line with pencil Pigtail lag bolts to be mounted 2 outbound from plumb line mark Move vehicle back out of garage before drill...

Page 11: ...DRILL CEILING RAFTER ATTACHMENT POINTS B Drill Mounting Boards Measure center to center distance between 7 32 rafter holes Mark distance on mounting boards Mark drill points along mounting board and D...

Page 12: ...ng board Attach pulley board with 5 16 x 3 lag bolts and washers Not Included Do not over tIghten Rope Pulley Mounting Board Rope Pulley Mounting Board B Using distance measurment from pg TBD mark raf...

Page 13: ...pencil Drill two 5 32 mounting holes Rope Pulley Mounting Board Rope Pulley Mounting Board B Assemble rope orginizer using plate and pulleys supplied in kit Fasten to 2 x 6 riser board with with two...

Page 14: ...Pigtail lag screw installation into rafter mounting board NOTE If distance to front wall is still too short it is possible to run the block and takle to the side of the vehicle instead of lengthwise P...

Page 15: ...with Pull pin shackle Remove pull pin and slip shackle end onto welded eye bolt Attach Block and Tackle system to shackle by reinstalling pin PULL PIN PULL PIN TO INSTALL TO INSTALL A Install black d...

Page 16: ...low shows proper proceedure steps 1 8 Place figure 8 knot as close to webbing as possible Cinch all four drop ropes ends exiting knot C Unbuckle webbing straps Run straps inside and out of the hardtop...

Page 17: ...STALLING RAISING OR LOWERING THE HOISTER DO NOT RAISE OR LOWER WITH ANYONE STANDING UNDER OBJECT KEEP AREA BELOW HOISTER CLEAR IF THE LOAD FALLS IT CAN CAUSE AN ACCIDENT WHEN OPERATING SYSTEM MAKE SUR...

Page 18: ...N LIFTED HARDTOP CAN COME DOWN VERY QUICKLY AND CAUSE AN ACCIDENT PART 3 COMPLETE YOUR INSTALLATION IS NOW COMPLETE E To lower hardtop angle blue black lifting rope back and pull This releases locking...

Page 19: ...r product What is Not Covered Your Quadratec Limited Warranty does not cover products or parts Quadratec determines to have been damaged by or subjected to a installation damage alteration modificatio...

Page 20: ...Instructions Part 12999 3307...

Reviews: