Step 9
FIG 53
FIG 52
FIG 51
FIG 50
FIG 49
FIG 48
FIG 47
FIG 54
Installing the Top to the Jeep® Body
Starting at the driver’s side front, right behind the front seat, attach the front vertical belt rail into the door surround slot
by “rolling the plastic into the slot
(FIGs 47 & 48).
Once secure move to the rear driver’s side corner and “roll” the plastic
into the Jeep body corner belt rail as shown in FIGs 49 & 50. Repeat this procedure on the passenger side.
Once both corners are secured, “roll” the plastic on the bot tom of the quarter windows into the body belt rail as shown in
FIGs 51 & 52.
NOTE: as shown in FIGs 53 & 54 there is a web loop insta lled on the side of the quarter window.
This is to be used for unhooking the quarter window only and is not designed to be pulled down on for installation!
Repeat the quarter window install on the passenger side of the vehicle. You may have to pull the corners around
towards the front or back of the vehicle to center the top on the vehicle. Once all body belt rail attachments are secure
and the top is centered, you can now reach through the rear zipper on each side and tighten the corner straps.
Alternate tightening to keep the top centered. Seal hook and loop around windows.
NOTICE
When removing the quarter windows from the Top deck,
make sure the zipper is
completely out of the "zipper box" before removing the window.
FIG 46
a
FIG 46
b