Setting the Pump Jack Poles:
1) Space poles uniformly not more than 7 feet on center when
using 2 inch thick nominal walk planks, 9 feet on center when
using 2 inch undressed lumber or 11 feet on center when us-
ing aluminum walk planks. Always support aluminum walk
planks longer than 12 feet at both ends and in the middle of
the walk platform. Poles shall not exceed 30 feet in height. 2)
Using rigid steel triangular bracing, attach a brace to the top
of each pole by loosening the wing nut on the brace’s clamp-
ing mechanism and sliding the clamping plates over the wood
pole so that the pole’s seam faces the carriage bolt. Then
tighten at the desired height. Nail clamp to pole. 3) Position
the poles along the work wall and secure in place. Always use
triangular steel pump jack braces. The round bar of the brace
should be fastened to the work wall at right angle to the walk
plank. The angle bar of the brace is then fastened to the right
or left as desired. Space between the brace arms is 32 inches,
enabling installation on studs 16 inches apart. The seam of
the pole must face the work wall. 4) All poles must bear on a
fi rm foundation or mudsill. Install a pole anchor, then insert
pole and secure in place. Or, using a 2”x10” square piece of
lumber remove enough dirt to insert board creating a fi rm level
foundation. Secure pole in place by blocking all four sides with
2x4’s and nailing in place. 5) Install triangular steel bracing
at the bottom of the pole to prevent movement. 6) Additional
pump jack braces must be installed vertically along each pole
no more than 10 feet apart.
Installing Pump Jack, Workbench, Guardrail and Walk
Planks:
Pump Jack:
Attach the pump jack to the pole with the platform
arm facing the work wall by removing the round pin and roller,
crank and square pedal. Place the pump jack over the pole
and reconnect parts. Secure all parts by inserting cotter pins
and bending one leg 90 degrees. Open pump jack by fully
extending the platform arm.
Walk Planks:
Place walk plank
onto platform arm. All scaffold planks must rest securely onto
the platform arm and extend no less than 6 inches and no more
than 12 inches over the support arm. When overlapping of
platforms is required there must be a minimum of 12 inches
of overlap. The support arm must be centered between the
overlapping walk planks and be secured from movement.