background image

21

Property Owners Limited Warranty

And Service Agreement

AeroCell

®

 or Bio-COIR

®

 Advanced Treatment System

THIS AGREEMENT is made by and between:

(Name)  

(Street address)  

(City/state/zip code)

  

 

Hereinafter PROPERTY OWNER; and 

(Name)  

(Street address)   

(City/state/zip code)  

 

Hereinafter SERVICE PROVIDER/INSTALLER; for the purpose of providing maintenance service for an AeroCell or 
Bio-COIR Advanced Treatment System, Hereinafter AeroCell/Bio-COIR; Installed at

(Location Name)  

(Street address) 

(City/state/zip code) 

Service Period:  The service period begins on the date of Final Inspection and approval by the governing regulatory 
authority or date of PROPERTY OWNER use, whichever comes first.  This agreement is for a service period of two (2) 
years.
Service Charge:  This initial two (2) year service agreement is included in the initial system purchase price. The manu-
facturer or authorized representative shall make available for purchase by the owner an extended service policy with terms 
comparable to those in the initial service policy. The cost of the extended service agreement is ($                 ).
Additional Charges:
This contract price does not include the cost of the following items, a) pumping the septic tank or pump basin(s), b) repair 
or replacement of parts that are furnished or manufactured by parties other than 

QUANICS

TM

, or c) repair or replacement 

of parts manufactured by 

QUANICS for which the warranty has expired. 

AeroCell/Bio-COIR Systems: The AeroCell/Bio-COIR Systems includes the septic tank(s), septic tank filter or filter 
plates, pump basin(s), pump(s) and controls, recirculation device, final dispersal system, AeroCell/Bio-COIR Modules/ 
and all miscellaneous parts attached to and required for the operation and service of the system.
PROPERTY OWNER Responsibilities
The PROPERTY OWNER confirms that he has read and understands the AeroCell/Bio-COIR Operation Manual and 
agrees to operate the 

QUANICS AeroCell/Bio-COIR Advanced Treatment System in accordance with QUANICS’s oper-

ating instructions.  Failure to use the system in accordance with the Operation Manual will void all warranties.  All repairs 
required to restore the system to normal operation will be at the PROPERTY OWNER’s expense.
Service Provided:
Under this agreement, normal service means minor adjustments and repairs required to keep the system in proper opera-
tion and does not include repairs required by improper installation or misuse of the system by others.  Service also does 
not include repair or replacement of any components that may be required due to normal use and wear that are not covered 
by 

QUANICS’s warranty. QUANICS or QUANICS’s Certified SERVICE PROVIDER shall inspect the AeroCell/Bio-

COIR systems once each six (6) months for a period of two (2) years, and service the components as outlined below:
General Service:
1. Waste Flow Usage: Determine the daily waste flow by reading the water meter or, if so equipped, the system flow me-
ter.
2. Collect Effluent Sample: Sample should be clear with a slight yellow tint, free from suspended solids and free from 
septic odor.  Samples not meeting this criteria should be analyzed for BOD and TSS levels.
3. PROPERTY OWNER Notification: Send a copy of the service report to the PROPERTY OWNER. Advise the PROP-
ERTY OWNER in writing of any problems or corrections including excessive water use. Notify the owner in writing 
about improper system operations that cannot be remedied at the time of inspection.
4. Regulatory Notification: Send a copy of the service report to the applicable regulatory agency, if required.
5. Manufacturer Notification: Send a copy of the service report to QUANICS as required to continue the AeroCell Limited War-
ranty.

Summary of Contents for AeroCell ATS-SCAT-8-AC-C500

Page 1: ...STWOOD KY 40014 FAX 502 992 8249 www quanics net CLASS I NSF STD 40 WASTEWATER TREATMENT SYSTEM OPERATION MAINTENANCE MANUAL MANUFACTURED PRODUCTS BY QUANICSTM FIXED FILM MEDIA WASTEWATER TREATMENT SY...

Page 2: ...c Tank 3 Section 2 0 A300 8 Series Effluent Filter 3 Section 3 0 Dosing Tank 4 Section 4 0 Filtered Pump Vault 4 Section 5 0 Controls Pumps Floats 4 Section 6 0 Treatment Module 4 Section 7 0 Recircul...

Page 3: ...s utilizing fixed film media The module s consist of a fiberglass tank s containing a pre determined amount of media Ef fluent is sprayed over the media utilizing specialized spay nozzles This patente...

Page 4: ...able float is down the pump will need to be activated manually by switching the HOA switch in the control panel to HAND 6 While the pump is running observe the spray nozzles in the treatment module fo...

Page 5: ...ed 2 Remove the filter panel Rinse the filter plates with fresh water making sure all septage is rinsed back into the tank The filter plates should be cleaned until all slots are open and free of de b...

Page 6: ...ocated at the proper level When the ball float is at its lowest position it should be located equal to or just above the on position of the timer enable float figure 1 2 Check that the design recircul...

Page 7: ...idge has been removed b Check the septic tank to see if it appears normal If not check with the PROPERTY OWNER to determine what inappropriate materials might have been added to the waste stream 3 Rec...

Page 8: ...ory personnel Follow these safety precautions when performing any excavation or construction work Follow all construction safety procedures during installation Follow electrical safety procedures duri...

Page 9: ...anics net autocad htm 750 GPD AeroCell System www quanics net autocad htm The septic tank shall have a minimum L W ratio of equal to or greater than one The septic tank shall have a minimum L W ratio...

Page 10: ...anics net autocad htm 1250 GPD AeroCell System www quanics net autocad htm The septic tank shall have a minimum L W ratio of equal to or greater than one The septic tank shall have a minimum L W ratio...

Page 11: ...ics net autocad htm The septic tank shall have a minimum L W ratio of equal to or greater than one The septic tank shall have a minimum L W ratio of equal to or greater than one 500 gallons per day 85...

Page 12: ...W ratio of equal to or greater than one The septic tank shall have a minimum L W ratio of equal to or greater than one 750 gallons per day 138ft3 of Bio COIR media 5 88 gpd ft3 hydraulic loading rate...

Page 13: ...W ratio of equal to or greater than one The septic tank shall have a minimum L W ratio of equal to or greater than one 1250 gallons per day 223ft3 of Bio COIR media 5 88 gpd ft3 hydraulic loading rate...

Page 14: ...T 886 BC C1250 1250 12 3 223 5 61 2500 1250 76 8 15 3 81 ATS SCAT 888 AC C1500 ATS SCAT 888 BC C1500 1500 12 3 255 5 88 3000 1500 76 8 15 3 98 The Zabel A300 8x18 VC model effluent filter is used in s...

Page 15: ...n Outlet hub accepts 4 or 6 SCH 40 outlet pipe All Zabel Filters accept SmartFilter alarm switch GPD Maximum Gallons Per Day FS Filtration Size Warranty for Defects in Material and Workmanship Effluen...

Page 16: ...3M 300 V SJOW jacketed 2 wire with ground Materials of Construction 300 grade stainless and cast iron Discharge 1 1 2 Warranty for Defects in Material and Workmanship All components 3 Years STEP SYSTE...

Page 17: ...ears PDS GT 2 0 STEP SYSTEMS Float Tree AC FT 3 Materials Pipe 1 5 or 2 SCH 40 PVC 1 5 or 2 PVC flex tubing True Union Ball Valve PVC Plastic Double block full port design 1 5 or 2 slip slip hubs Fitt...

Page 18: ...electrical lines HOA Switch for manual pump control mounted on cir cuit board Float Switch Terminal Block Alarm and Control Fuses Programmable Timer with separate variable controls al lows for setting...

Page 19: ...harge Assembly 2 Years Float Valve Assembly 2 Years ATS GRD 100 80 20 N Materials Risers and Lids High density non corrosive polyethyl ene plastic Stainless steel screws Neoprene gasket IMPORTANT When...

Page 20: ...19 Wiring Schematics...

Page 21: ...20 Consecutively Serial Numbered Data Plates Maintenance Sticker...

Page 22: ...Y OWNER Responsibilities The PROPERTY OWNER confirms that he has read and understands the AeroCell Bio COIR Operation Manual and agrees to operate the QUANICS AeroCell Bio COIR Advanced Treatment Syst...

Page 23: ...m the date of installation pumps for a period of three years from the date of installation and AeroCell Bio COIR foam for a period of ten years from the date of installation Failed warranted parts sha...

Page 24: ...X 1520 PHONE 502 992 8200 6244 OLD LAGRANGE ROAD 1 877 QUANICS CRESTWOOD KY 40014 FAX 502 992 8249 www quanics net Treatment system service provider 082707 326 E n g i n e e r i n g Water S o l u t i...

Reviews: