I
NSTALLING
H
ARDWARE
I
NSTALLING
A
SAS 6G M
EZZANINE
C
ARD
2-35
4. Remove nine (9) memory modules.
5. Connect the SAS cables to the ports on the module.
Figure 2-50. 6G SAS Cables and Module Ports
6. Turn the module assembly so that the linking board is fac-
ing the mainboard.
7. Align the linking board with the mainboard connector.
Figure 2-51. 6G Linking Board and Mainboard Connector
8. Connect the linking board to the mainboard connector.
4
5
6
Summary of Contents for STRATOS S210 Series S210-X22RQ
Page 22: ...REVISION HISTORY XXII ...
Page 23: ...About the Server Chapter 1 ...
Page 36: ...Installing Hardware Chapter 2 Installing Hardware Chapter 2 ...
Page 83: ...BIOS Chapter 3 BIOS Chapter 3 ...
Page 152: ...BMC Chapter 4 BMC Chapter 4 ...
Page 218: ...Mainboard Jumpers and Connectors Chapter 5 ...
Page 223: ...Rail Kit Assembly Chapter 6 Rail Kit Assembly Chapter 6 ...
Page 228: ...Troubleshooting Chapter 7 Troubleshooting Chapter 7 ...
Page 238: ...Safety Information Chapter 9 Safety Information Chapter 9 ...