R
AIL
K
IT
A
SSEMBLY
R
AIL
K
IT
A
SSEMBLY
6-1
6.1. Rail Kit Assembly
Installing the Rack Brackets
Note:
The rail length is as follows:
24” without stretching.
36” when fully stretched.
WARNING!
Whenever you need to lift the system, get others to assist you. To
avoid injury, do not attempt to lift the system by yourself.
WARNING!
The system is not fixed to the rack or mounted on the rails. To
avoid personal injury or damage to the system, you must ade-
quately support the system during installation and removal.
WARNING!
To avoid a potential electrical shock hazard, a third wire safety
grounding conductor is necessary for the rack installation. The
rack equipment must provide sufficient airflow to the system to
maintain proper cooling.
!
!
!
CAUTION!
W
HEN
INSTALLING
RAILS
IN
A
SQUARE
-
HOLE
RACK
IT
IS
IMPORTANT
TO
ENSURE
THAT
THE
SQUARE
PEG
SLIDES
THROUGH
THE
SQUARE
HOLES
.
CAUTION!
S
QUARE
STUDS
MUST
BE
FLUSH
WITH
THE
RACK
POSTS
TO
INSTALL
PROPERLY
.
!
!
Summary of Contents for STRATOS S210 Series S210-X2A2J
Page 21: ...SAFETY INFORMATION XXI ...
Page 23: ...About the Server Chapter 1 ...
Page 33: ...Installing Hardware Chapter 2 ...
Page 106: ...BIOS Chapter 3 ...
Page 166: ...BMC Chapter 4 ...
Page 229: ...Jumpers and Connectors Chapter 5 ...
Page 236: ...Rail Kit Assembly Chapter 6 ...
Page 240: ...Troubleshooting Chapter 7 ...
Page 245: ...Installation and Assembly Safety Instructions Chapter 8 ...
Page 249: ...Safety Information Chapter 9 ...
Page 258: ...Regulatory and Compliance Infor mation Chapter 10 ...