5
4.4.
THE QUALITY ASSURANCE MANAGER WILL CONFIRM THAT
QUANTACHROME TECHNICIANS FOLLOW ALL PROCEDURES IN
COMPLIANCE WITH THE GUIDELINES STATED IN THE COMPANY QUALITY
MANUAL.
4.5.
THE PRODUCT MANAGER WILL EVALUATE ALL REVISIONS TO THIS
DOCUMENT TO ENSURE COMPLIANCE WITH ENGINEERING DESIGN
REQUIREMENTS.
5.0. REQUIREMENTS
5.1. ELECTRICAL AND MECHANICAL INSPECTION
5.1.1 ELECTRICAL
5.1.1.1 WIRING - VERIFY THAT ALL WIRING CONTINUITY CONFORMS TO THE
LATEST REVISION DRAWING
5.1.1.2. VISUALLY INSPECT THE DIGITAL PANEL METER CONNECTOR FOR
CORRECT WIRING AND ALL SOLDERING FOR COLD JOINTS.
5.1.1.3. VERIFY THAT TWO 2 AMP FUSES ARE INSTALLED IN THE CORCOM.
REMOVE THE FUSE BY SLIDING THE BLACK HANDLE IN THE CORCOM TO THE
LEFT. REINSTALL THE FUSES IF THE AMPERAGE IS CORRECT.
5.1.1.4. RECONFIGURE THE CORCOM TO MATCH THE VOLTGE REQUIRED FOR
THE CUSTOMER ORDER (FUSED ELECTRICAL RECEPTACLE) FOR 120 VAC.
PUSH THE PLASTIC SHIELD TO THE LEFT,
5.1.1.5.
THE NEW CORCOM HAS A BARREL TYPE VOLTAGE ADJUSTMENT. DO
NOT SPIN THE BARREL OR YOU MAY DAMAGE THE CONTACTS. PULL OUT THE
BARREL AND ROTATE THE BARREL TO THE SPECIFIED CUSTOMER VOLTAGE
REQUIREMENT.