5
3. Commissioning
1) Remove the lid and fill the water tank with water (see water level gauge outside).
Never operate the unit with a liquid level beneath the lowest water level mark
“min”!
2) Connect the water pipes, check for possible leaks.
3) The unit is designed to operate with a tank temperature control kit which includes a
submersible pump and plastic tubes to lead Glycol water through it. The fittings on the lid
of the unit should be used to connect the plastic tubes. Such kits are not provided with
the unit. If used, please connect them according to the instructions of the manufacturer.
4) Close the lid.
Do not operate the unit when it is open with the lid removed!
5) Establish the electric network connection (see 1.5 Electrical installation)
6) Adjust the required temperature on the thermostat (see 5. temperature setting). After
reaching the adjusted set-point temperature the unit is ready for operation (see also 1.1
safety measures).
3.1 Connection
Verify that all connections are sealed. No dirt particles may gain access into the pipes and
the cooling water in the unit.
Summary of Contents for GLY401
Page 11: ...11...