4. Decommissioning
Switch off the unit and disconnect the power plug.
Remove the pipes/hoses from the unit.
Draining and cleaning of the unit by qualified personnel.
5. Temperature setting
Thermostatic operation: adjust the desired set-point temperature at the controller (5).
Never operate the unit when it is open with the lid removed!
M ake sure that the lid is fastened before switching the unit on!
For ice bank building
Ice bank will be build approx. 2 hours after starting the unit
Recommended set-point temperature for using an ice bank: -1,0 °C (30,2 °F)
ATTENTION:
to avoid damage on the unit (internal freezing) => Never let the
working machine unattended over a longer time (cooling without glycol in the
water)
For required cold water temperatures down to -6 °C (21,2 °F)
For cooling temperatures down to -6 °C (21,2 °F) use a glycol-water mixture (min. 30
% propylene glycol)
No ice bank building possible due to the anti-frost qualities of the glycol
7
Expansion valve
11
Submersible pump
8
Condenser
12
Hoses for water circuit
9
Fan
13
Evaporator (cooling circuit)
10
Water tank
14
Cooling coil (optional)
7
8
9
10
11
12
13
14
Summary of Contents for ICECHILLY
Page 11: ......