Scalar i6000 Installation Guide
109
4
Remove the necessary number of cover plates from the I/O management unit by pressing to the left and
pulling out on the latchhooks.
Either discard the unused cover plate or leave it with the customer for future use.
5
Remove the blade from the anti-static bag.
6
Press up and out to open the latchhooks on each side of the blade.
7
Evenly apply pressure to both sides of the blade and slide it into the I/O management unit until the
latchhooks begin to move towards the middle of the blade. Push the latchhooks towards the middle of
the blade and into the lock position. You will feel the blade pins connect with the I/O management unit’s
backplane as the blade locks into place.
CAUTION
Forcing the blade into the bay can cause the pins to bend.
cover plates
latchhooks
Summary of Contents for Scalar i6000
Page 20: ...8 About This Guide and Your Product...
Page 38: ...26 Installing a Stand Alone Control Module...
Page 104: ...92 Installing a Multi Module Library...
Page 156: ...144 Installing Cartridges...
Page 164: ...152 Setting up Your Library for Access...
Page 242: ...230 Configuring the Library...
Page 304: ...292 Adding Optional Hardware eight 2 5 mm screws...
Page 318: ...306 Adding Optional Hardware...
Page 336: ...324 Installation Testing and Verification Figure 35 Example Test Log Output...
Page 356: ...344 Testing and Calibrating the Digital Level...
Page 362: ...350 LBX Board and Terminator...
Page 380: ...368 Glossary...
Page 384: ...372 Index...