Scalar i6000 Installation Guide
213
6
Select the check box to map a device or clear the check box to unmap a device, then click
Next
to
continue.
The
LUN Mapping Wizard – What Next?
dialog box appears.
7
Select one of the following and click
Next
to continue:
•
Map another blade
– this allows you to map another blade on the same partition.
•
Map another partition
– this allows you to map another partition on the same host.
•
Map another host
– this allows you to map another host.
•
Continue and preview all the changes
– this allows you to view an online printout of the
change report which presents a preview of all changes, showing whether you added, modified
or deleted any devices.
If your configurations are complete, select
Continue and preview all changes
.
The
LUN Mapping Wizard – Preview All Changes
dialog box appears.
Summary of Contents for Scalar i6000
Page 20: ...8 About This Guide and Your Product...
Page 38: ...26 Installing a Stand Alone Control Module...
Page 104: ...92 Installing a Multi Module Library...
Page 156: ...144 Installing Cartridges...
Page 164: ...152 Setting up Your Library for Access...
Page 242: ...230 Configuring the Library...
Page 304: ...292 Adding Optional Hardware eight 2 5 mm screws...
Page 318: ...306 Adding Optional Hardware...
Page 336: ...324 Installation Testing and Verification Figure 35 Example Test Log Output...
Page 356: ...344 Testing and Calibrating the Digital Level...
Page 362: ...350 LBX Board and Terminator...
Page 380: ...368 Glossary...
Page 384: ...372 Index...