68
Installing a Multi-Module Library
6
Connect the W2 Ethernet cable to the J3 connection on the LBX board on the control module or last
expansion module in the existing configuration.
This connects the J4 connection on the LBX board in the new expansion module to the J3 connection
on the LBX board in the control module or last expansion module in the existing configuration.
7
Determine the LBX terminator installation:
•
Determine your library configuration and verify what style of terminator is needed. There are two
versions of the LBX terminator board (card). For more information, see
•
Once you have determined what style of terminator you need, install it into the J17 connection on
the LBX board in the last expansion module.
Note
The LBX board has three versions and the LBX terminator has two
versions. For more information, see
LBX board on
expansion module
LBX board on
control module or
W1 cable
J2
J1
J2
J17
J1
expansion module
(large ribbon cable)
J3
J4
W2 cable (Ethernet)
J17 connection
LBX terminator
Summary of Contents for Scalar i6000
Page 20: ...8 About This Guide and Your Product...
Page 38: ...26 Installing a Stand Alone Control Module...
Page 104: ...92 Installing a Multi Module Library...
Page 156: ...144 Installing Cartridges...
Page 164: ...152 Setting up Your Library for Access...
Page 242: ...230 Configuring the Library...
Page 304: ...292 Adding Optional Hardware eight 2 5 mm screws...
Page 318: ...306 Adding Optional Hardware...
Page 336: ...324 Installation Testing and Verification Figure 35 Example Test Log Output...
Page 356: ...344 Testing and Calibrating the Digital Level...
Page 362: ...350 LBX Board and Terminator...
Page 380: ...368 Glossary...
Page 384: ...372 Index...