background image

———————————————————— ———————————--------————————— 
QUATREAU TOUCH: PRE-INSTALLATION CHECK LIST 

Please read the installation notes on the last page of this manual.

———————————————————— ———————————--------————————— 

1.  Correct sized hole drilled in worktop i.e. 40mm set back approx 50mm from 

  back  edge of sink

2.  Mains Cold Water: 1/2” lever ball valve, locatied top front right side wall 

  of cupboard, set back 150mm from door, 500mm up from base.

3.  Thermostatic Valve to be installed so that it is accessible for adjustment

  on the same side of the cupboard as the mains cold water supply. Note

  that this is in addition to the isolated Mains Cold Water that will be used

  to feed a cold supply to the system.

4.  Drainage: An approved Type AA fitting (air gap) must be used for the Venturi

  waste. Either a trapped upstand or drain clamp can be used or equivalent    

  connection approved in the Country or State of installation.

5.  Power: The system requires 2 x 15amp sockets or one double socket located

  front left wall of cupboard, 500mm up from back set back approx 150mm.

6.  Ventilation for the chiller unit must be cut into the base of the cupboard before  

  starting the installation. Templates are included in the Pre-Installation Guide and a  

  paper template will be inside the packing box of the chiller unit.

———————————————————— ———————————--------————————— 
QUATREAU TOUCH 
TYPICAL INSTALLATION 
———————————————————— ———————————--------————————— 

PRE INSTALL CHECK LIST

Summary of Contents for PureH2O Touch

Page 1: ...BOILING CHILLED SPARKLING HOT COLD Touch INSTALLATION GUIDE...

Page 2: ...PRE INSTALLATION CHECK LIST 3 TYPE AA AIR GAP 4 INSTALLATION 5 UNPACKING YOUR EQUIPMENT 5 INSTALLING THE QUATREAU TOUCH TAP 5 INSTALLING THE QT553 B boiler control module 7 INSTALLING THE CS20 8 IMPO...

Page 3: ...ed Mains Cold Water that will be used to feed a cold supply to the system 4 Drainage An approved Type AA fitting air gap must be used for the Venturi waste Either a trapped upstand or drain clamp can...

Page 4: ...le water device The interconnection pipe must run downhill as shown here into the Airgap connection Stage 2 provides a secondary non return valve in the grey adaptor whilst stage 2 provides an air gap...

Page 5: ...and electrical connection that will be in a plastic bag inside the packing A contents list will explain what should be included and what the parts are used for PRIOR TO INSTALLATION WE RECOMMEND THAT...

Page 6: ...nel faces forward towards the user position 180 degrees to the sink Now you can tighten the nuts until you have a firm fixing on both sides The comms cable hangs down and will connect into the QT553 B...

Page 7: ...ust flow for mains hot and cold if the thermostatic valve is out of reach This will control the cold water mains feed that is fitted to the left rear low level fitting labeled cold mains inlet It will...

Page 8: ...he boiler unit at the back Push gently until it clicks in Connect the power lead but do not turn on at this stage QUATREAU TOUCH INSTALLING THE CS20 Before installation of the chiller unit refer to th...

Page 9: ...ontrol unit 3 Install Thermostatic mixing valve and set to maximum temperature then reduce by 1 2 turn for 40C set point Connect the hot and cold feeds with isolators 4 Install Drain off saddle with t...

Reviews: