———————————————————— ———————————--------—————————
QUATREAU TOUCH: PRE-INSTALLATION CHECK LIST
Please read the installation notes on the last page of this manual.
———————————————————— ———————————--------—————————
1. Correct sized hole drilled in worktop i.e. 40mm set back approx 50mm from
back edge of sink
2. Mains Cold Water: 1/2” lever ball valve, locatied top front right side wall
of cupboard, set back 150mm from door, 500mm up from base.
3. Thermostatic Valve to be installed so that it is accessible for adjustment
on the same side of the cupboard as the mains cold water supply. Note
that this is in addition to the isolated Mains Cold Water that will be used
to feed a cold supply to the system.
4. Drainage: An approved Type AA fitting (air gap) must be used for the Venturi
waste. Either a trapped upstand or drain clamp can be used or equivalent
connection approved in the Country or State of installation.
5. Power: The system requires 2 x 15amp sockets or one double socket located
front left wall of cupboard, 500mm up from back set back approx 150mm.
6. Ventilation for the chiller unit must be cut into the base of the cupboard before
starting the installation. Templates are included in the Pre-Installation Guide and a
paper template will be inside the packing box of the chiller unit.
———————————————————— ———————————--------—————————
QUATREAU TOUCH
TYPICAL INSTALLATION
———————————————————— ———————————--------—————————
PRE INSTALL CHECK LIST