connections as per previous step (step 1).
Once you have connected the feed
from the thermastatic mixing valve to
the QT553-B unit turn both the hot and
cold services until 50% open. These
connections feed a robust, one piece
manifold. Whilst a water tight seal should
be instantly achieved with the push fittings,
its important to observe and listen for any
water escaping.
Now connect the cold water feed to the
right hand side of the QT553-B. using the
1/4” PE pipe provided. The speed fitting will
make a water tight seal when the pipe is
pushed firmly into the port labeled PURE
INLET. Note that this can be fed by either a
purifier or mains cold water.
If using a purifier to feed the system ensure
it has been commissioned with a 50psi
deact switch prior to connection. You will
use several litres of water to commission
the Quatreau system so it is sensible to
commission with mains water first then
convert to pure once the system has been
purged.
Connect the communications cable to
the comms port found to the left side of
the boiler unit at the back. Push gently until
it clicks in. Connect the power lead but do
not turn on at this stage.
————————————————————
QUATREAU TOUCH
INSTALLING THE CS20
————————————————————
Before installation of the chiller unit, refer
to the cutting template enclosed with
the chiller. A ventilation hole is cut in the
base of the cupboard and the vent pipe
run to and cut into the kick board using
the ventilation grill provided. See Pre-
Installation guide for more information.
Ventilation will ensure your chiller performs
to its specification. Failure to install this will
void the warranty on this module.
The Quatreau chiller carbonator is sited
next to the QT553-B. Usually this will be to
the left of the QT553-B.
Use the 1/4” PE pipe provided to
interconnect the QT553-B and CS20 units
as follows.
• From the QT553-B to the CS20
• H2O OUT to WATER IN
• CO2 OUT to CO2 GAS IN
• CARB IN to SODA WATER OUT
• CHILLED IN to STILL WATER OUT
Ensure that you leave a 50mm gap
around the sides of the chiller unit - this
enables ventilation and air movement
without which the system will not chill
correctly.
————————————————————
DO NOT POWER UP EITHER SYSTEM
UNTIL YOU READ THE COMMISSIONING
INSTRUCTIONS. APPLYING POWER TO
THE CHILLER UNIT WILL DAMAGE THE
CARBONATER WILL DAMAGE THE PUMP
————————————————————
INSTALL ATION