background image

IMPORTANT INFORMATION

TECHNICAL DETAIL 

QUATREAU 553-B 

 QUATREAU CHILLER CARBONATOR CS20

POWER REQUIREMENTS  

1 x 13A socket 

1 x 13A socket

(RCD Protected) 

VOLTAGE 220V 

220V

WATTAGE 
Max consumption 

1.5KW 

296W

Standby consumption 

80W  

100W

START UP TIME 

10 minutes 

10 minutes

MAX WORKING PRESSURE  Max 4Bar (Min 2Bar) 

30 psi

CO2 CAPACITY 

 

100ltrs carbonated water

INSTALLATION DETAIL 

BY AUTHORISED QUATREAU TECHNICIAN ONLY

INSTALLATION DATE

INSTALLATION NOTES 

Installation of the Quatreau Touch is best achieved using the following  

 sequences:

1.  Site the equipment to check it all fits, chiller to the left of the boiler. 
2.  Install the TouchTap (note the comms cable must reach the boiler 

control unit).

3.  Install Thermostatic mixing valve and set to maximum temperature 

then reduce by 1/2 turn for 40C set point. Connect the hot and 
cold feeds with isolators.

4.  Install Drain off saddle with type AA air gap (rear left corner of 

cupboard).

5.  Cut the ventilation for the chiller.
6.  Fit the boiler control unit using the silicon hoses included in the kit. 
7.  Connect the mains hot and cold to the left side of the boiler and 

test for water tightness.

8.  Connect the cold feed to the top front right side of the boiler and 

activate testings for water tightness.

9.  Connect power cable but do not turn on.
10.  Connect the comms cable from the TouchTap.
11.  Fit the chiller unit and make all interconnections pure outlet and 

CO2 outlet into boiler and the chilled and sparkling outlets back 
into the boiler.

Then read the commissioning Instructions.

CONTACT

 www.quatreau.com

INSTALL ATION

Summary of Contents for PureH2O Touch

Page 1: ...BOILING CHILLED SPARKLING HOT COLD Touch INSTALLATION GUIDE...

Page 2: ...PRE INSTALLATION CHECK LIST 3 TYPE AA AIR GAP 4 INSTALLATION 5 UNPACKING YOUR EQUIPMENT 5 INSTALLING THE QUATREAU TOUCH TAP 5 INSTALLING THE QT553 B boiler control module 7 INSTALLING THE CS20 8 IMPO...

Page 3: ...ed Mains Cold Water that will be used to feed a cold supply to the system 4 Drainage An approved Type AA fitting air gap must be used for the Venturi waste Either a trapped upstand or drain clamp can...

Page 4: ...le water device The interconnection pipe must run downhill as shown here into the Airgap connection Stage 2 provides a secondary non return valve in the grey adaptor whilst stage 2 provides an air gap...

Page 5: ...and electrical connection that will be in a plastic bag inside the packing A contents list will explain what should be included and what the parts are used for PRIOR TO INSTALLATION WE RECOMMEND THAT...

Page 6: ...nel faces forward towards the user position 180 degrees to the sink Now you can tighten the nuts until you have a firm fixing on both sides The comms cable hangs down and will connect into the QT553 B...

Page 7: ...ust flow for mains hot and cold if the thermostatic valve is out of reach This will control the cold water mains feed that is fitted to the left rear low level fitting labeled cold mains inlet It will...

Page 8: ...he boiler unit at the back Push gently until it clicks in Connect the power lead but do not turn on at this stage QUATREAU TOUCH INSTALLING THE CS20 Before installation of the chiller unit refer to th...

Page 9: ...ontrol unit 3 Install Thermostatic mixing valve and set to maximum temperature then reduce by 1 2 turn for 40C set point Connect the hot and cold feeds with isolators 4 Install Drain off saddle with t...