Installation
QUBEVSM-V01-R0 Installation and Operation Manual
Intelligent Electric Vehicle Chargepoints
February 2023
Page
12
of
42
If a Mounting Post Will be Used
1. Prepare the ground and place the mounting post in the desired location.
x
Make sure the power supply cable, the ethernet cable (if required), and the Load
Balancing CT cable (if required) are fed upward through the tube of the post and exit
through one of the apertures. Seal other apertures with the provided blanking panels.
NOTE:
The ethernet connection within the charger is solely for connection to an
OCPP back-office. It is not for use with the Smart Application.
2. If required, secure the post in place with fixings that are appropriate for the mounting
surface.
3. When mounting the charger to the post, the charger mounting bracket must first be
attached to the plate on the post using the pre-drilled holes and supplied fasteners. The
charger can then be secured onto its mounting bracket at the appropriate point of the
installation.