47
EN
INSTALLATION AND USE MANUAL
QUICK MC²X 16k - 16k LV
- REV001E
16k - 16k LV
9 - Start-up
Before you start, follow the indicated sequence to properly execute the mechanical and electrical
installation operations described in the previous sections.
Before the start-up, the protections that had been previously removed must be put back in place, and the
area surrounding the stabilizer must be cleared of personnel and equipment.
9.0 - Introduction
This section describes the first start-up of the stabilizer.
9.1 - Start-up instructions
Switch on the stabilizer via the
MC
2
X RC Remote Control panel
(refer to the
MC
2
X RC Remote Control Panel
user's
manual).
10.1 - Warnings
• Before any maintenance operation
disconnect the power supply and make sure that the
FLYWHEEL HAS COMPLETELY STOPPED.
• The warranty does not cover, under any circumstances, damages to property/ people, in the
event that maintenance (of any type) is carried out before the stabilizer is disconnected from
the power supply and the mass is completely still.
• Restore the power supply only after having correctly refitted all the safety devices that were
previously removed.
10.0 - Introduction
Quick MC
2
X gyro stabilizers
are built with materials resistant to the marine environment.
Maintenance is however mandatory, even if no problems occur.
Quick
®
recommends a periodical inspection every 2000 hours and an annual one.
10 - Maintenance